Loading…
Loading…
58 results • Latest
Construction of Proposed Vulnerable Witness Deposition Centre at Khatra Sub-Divisional Court under Bankura Division, PWD. 2nd call
Emergent repairing work at Kotalpara-Khusiganj Road from ch. 0.100 kmp to 0.400 km, 0.700 kmp to0.850 km, 1.200 km to 1.400 km, 4.100 km to 4.400 km and 4.550 km to 5.00 km- by stitching picked jhama bricks under Hooghly Construction Sub-Division No.
Emergent repairing work at Kotalpara-Khushigung Road From Chainage 5.00 kmp to 5.40 Km, 5.60 km to 5.90 km, 6.20 km to 6.60 km, 6.90 km to 7.10 kmp and 7.30 km to 7.60 kmp - Stitching with Picked Jhama Bricks and WBM by Jhama Metal under Hooghly Cons
Emergent repairing work at Kotalpara-Khushigunj Road From Chainage 1.500 kmp to 1.750 Km, 2.150 kmp to 2.500 Km, 2.650 km to 2.900 km, 3.100 km to 3.450 km and 3.600 km to 3.950 km - by stitching picked jhama bricks under Hooghly Construction Sub-Div
Repair in patches from ch. 7.00 kmp to ch. 13.00 kmp of Onda-Taldangra Road under Bishnupur Division, P.W.Dte in the District of Bankura during the F.Y-2026-27
Emergent repairing potholes at different roads in patches under Hooghly Division, PWD during the year 2026_27.
CD of Tarkey Structure
Non destructive test for structural Health check up with capturing videography, images detailed report for the Bridge over river Bhairab Banki at 29.80 Km of Simlapal Benagoria via Raipur Road (SH-9) under Bishnupur Division, P.W,Dte. in the Distri