Loading…
Loading…
Found 60 active tenders
60 results • Latest
Distempering, painting and other misc. civil work of newly allotted/changeover quarters like miners Quarter, 1B type, 1C type, B type, C type, 2A and 2B type of Umrer township of Umrer Area.
Item Description/ Heading
Development of Eco Park on Nagpur Chandrapur highway at Urjagram under Wani Area of WCL (Phase 1)
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Repair and renovation of balance portion of works in and around RRRT office building of Wani Area
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area
Providing wind barrier along the road from DP Pole to Old Mazar at Adasa UG to OC to reduce propogation of dust in nearby villages of Saoner Sub Area.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m. All kinds of soil.
Drilling and Construction of 01 Nos of Piezometer at Silewara UG Mine under Silewara Sub Area.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Dismantling of Old RCC Water Tanks and Replacement with PVC Water Tanks including APP Waterproofing Treatment and CPVC/G.I. Plumbing Works in Miners Type Quarters at Chankapur Colony Under Silewara Sub Area
Labor charges for disconnecting and re-fixing existing 500 litre pvc water storage tank on roof, including pipe joint opening , shifting , placing in position, and aligning with existing connections as per instructed by engineer in charge.