Loading…
Loading…
18,186 results • Latest
SUPPLY AND COMMISSIONING OF THREE PHASE LOCO WHEEL SET JOURNAL COVER AS PER DRAWING NO: A3/2020/CNB/2733/5380/S.MAINT ALT-A.
Tag for air brake cylinder.
Monthly Basis Cab & Taxi Hiring Services - MUV; 1500 km x 320 hours; Outstation 24*7
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Annual Maintenance Contract of AC package unit of various make fitted on LHB type and SG AC coaches of roof mounted design of BDTS coaching depot of Mumbai Division for a period of ONE year.
Rajula Jn.-Pipavav Section: Through Sleeper Renewal (TSR)- KM: 13/0 to 22/0 (Total-09 Tkm).
Bhavnagar Division: Rebuilding of arch bridges (8Nos) by providing RCC Box under DEN (West) Jurisdiction. (With maintenance period up to 4 years as per latest guideline)
Bhavnagar Division : Exploratory Drilling and Laboratory/Field Testing for Safe Bearing Capacity Assessment at various Level Crossings for proposed RUBs.
TRD work in connection with Interlocking work at LC Gate Number-203, 241, 258 and Vavaniya (WWA), Dahinsara (DAC), Barwala Road(BRL), Bhakti-Nagar(BKNG) stations various locations in the jurisdiction of Rajkot division.
OHE Modification work in connection with construction of new Line-14 and CSR increment of existing Line No-15 at HAPA station of Rajkot division.