Channveer Farmer Producer Company Limited Solapur | Solapur, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 124 Aug → 30 Aug SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING ANDCOMMISSIONING OF TOTAL 125 KW
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 30 Aug 2 days left Sindola Taluka Saoli District Chandrapur | Yavatmal, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 225 Aug → 1 Sept Supply Installation Testing and Commissioning of Total 10 KW of On Grid Connected Rooftop Solar PV Power Plant
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 1 Sept 4 days left At Hatedi Tq Dist Buldhana | Buldhana, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 124 Aug → 31 Aug Supply Installation Testing and Commissioning of Mini Oil Mill 500 Kg
Maharashtra Goods Electrical Goods
Refer Docs • 31 Aug 3 days left Chinchala, Tq. Wadwani | Beed, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 123 Aug → 29 Aug Supply, Installation, Testing and Commissioning of Weighbridge 50 MT
Maharashtra Goods Farm Machinery and Equipments
At. Kachewani, Tah. Tiroda Dist. Gondia | Gondia, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 127 Aug → 7 Sept Supply, Installation, Commissioning and Testing of Rice Mill Unit 2 TPH At. Kachewani, Tah. Tiroda Dist. Gondia
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 7 Sept 10 days left AT POST MANDAVGAN Pharata TQ.SHIRUR DISTRICT-PUNE | Pune, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 127 Aug → 3 Sept Supply Installation Testing and Commissioning of Dock Leveler System(DLS) 2000mm x 2500 mm with Std. Rubber Bumper 1 Pair
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 3 Sept 6 days left At. Borgaon Tah. Deori Dist. Gondia441901 | Gondia, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 127 Aug → 7 Sept Supply, Installation, Commissioning and Testing of Moha Rab Ladu Making Machine-1.5TPH At. Borgaon Tah. Deori Dist. Gondia441901
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 7 Sept 10 days left At.Post. Pandare Tq Baramati Dist- Pune | Pune, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 127 Aug → 2 Sept Supply Installation Testing and Commissioning of Fully Auto. Wheat Flour (ATTA) Mill with Auto Control Chakki 500 KGPH
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 2 Sept 5 days left Chasnali, Tal. Kopargaon | Ahmednagar, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 124 Aug → 31 Aug Survey, Design, Fabrication, Supply, Installation, Testing and Commissioning Of Total 34.55 Kwp Of On Grid Connected Rooftop Solar Pvpower Plant including Comprehensive Maintenance Contract (CMC) For 3 Years
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 31 Aug 3 days left AT POST MANDAVGAN Pharata TQ.SHIRUR DISTRICT-PUNE | Pune, Maharashtra · 14d ago Published 14 Aug 2026 Corrigendum 127 Aug → 3 Sept Supply Installation Commissioning and Testing Of Reefer Vehicle 2 MT
Maharashtra Goods Farm Machinery and Equipments
Refer Docs • 3 Sept 6 days left