Loading…
Loading…
847 results • Latest
Supply, Installation, Testing Commissioning Of Bedana Sortex Machine With AC Cabin 3 TPH
SUPPLY AND INSTALLATION, COMMISSIONING AND TESTING OF JOWAR PROCESSING UNIT 0.3 TPH
Construction of Warehouse 250 MT
Construction of Raisin Processing Plant Shed 242.74 Sq. M
Procurement of Handheld X-Ray fluorescence Spectrometer on Cementitious and Similar Materials
Consultancy Services for Hiring a Firm for External Auditing at PMU, PIUs and Water Utilities at Ludhiana and Amritsar
CONSTRUCTION OF ONION STORAGE SHED 250 MT
CONSTRUCTION OF ANIMAL HOLDING AREA 92.90 Sq.Mt.(1000 Sq.Ft.)
Construction of Animal Holding Area 92.90 Sq.mt.(1000 Sq.ft.)
Supplying Installation Testing and Commissioning of BLDC ceiling fans at Yoga Hall in Sports Complex
Supply Installation Testing and Commissioning of LT cables along with necessary excavation laying of DWC pipes fixing replacement of junction boxes with required accessories and allied works for street light poles at various locations across the VNIT
SUPPLY INSTALLATION TESTING COMMISSIONING OF WEIGH BRIDGE 100 TON CAPACITY AT AATMA COTTON PRODUCER COMPANY LIMITED KAMTHA TQ MURTIJAPUR DIST AKOLA
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF TRANSFORER 200 KVA AT AATMA COTTON FPC KAMTHA TQ DIST AKOLA
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF FIRE PROTECTION FIGHTING SYSTEM FIRE PUMP HYDRANT AND AUXILLARY at KAMTHA TQ MURTIJAPUR DIST AKOLA
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF OF 55 HP TRACTOR WITH LOADER AT AATMA COTTON PRODUCER COMPANY LIMITED KAMTHA TQ MURTIJAPUR DIST AKOLA
GRADED BUNDING -YEDSABHA GAT NO 1,2,3
GRADED BUNDING -KAODASI-gat no 1,2
RENNOVATION OF PADDY BUNDING Somnala GAT NO1,2,3 And GRADED BUNDING Somnala GAT NO1,2,3,4,5
Composit Gabian Bandhara FUKESHWAR GAT NO 1 AND 2
SUPPLY INSTALLATION COMMISSIONING AND TESTING OF FIRE PROTECTION and FIGHTING SYSTEM -FIRE PUMP HYDRANT AND AUXILLARY at AKOLA FARMER PRODUCER COMPANY LTD ugva tq dist akola
Composit Gabian Bandhara Gat Kra-1,2,3,4
EXISTING CNB SILTATION AND NALA DEEPENING NAME OF VILLAGE KHURSAPAR GAT NO 1,3,5 TAH.SAMUDRAPUR, DIST. WARDHA
EXISTING CNB SILTATION AND NALA DEEPENING NAME OF VILLAGE DHAMANGAON GAT NO- 5 , 6, 7 TAH.SAMUDRAPUR, DIST. WARDHA
Zone-2 ward-73/29 Jajmau/ Om Purwa Military farm transformer to Galla Godown via Madina Maszid and from Sar Syed School to tel meel chauraha in the internal lanes HMP/construction work of interlocking road
Construction of Cleaning Grading Shed 107.00 Sq. Mtr.
Construction of Cleaning Grading Shed 91.45 Sq. Mtr. and Warehouse 250 Mt.
Construction of Cleaning and Grading Shed 107 Sq. Mtr. and Warehouse 250 Mt.
Construction of Cleaning Grading Shed and Sorting Unit 185.35 Sq. Mtr.
Construction of Cleaning Grading Shed 107 Sq. Mtr.
Construction of Cleaning and Grading Shed 107.00 Sq. Mtr.
Construction of Warehouse 300 Mt.
Supply and Installation, Commissioning and Testing of Packing Machine with Digital Control Panel
Supply And Installation, Commissioning And Testing Of Biscuits And Cooking Machine 0.3 TPH
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF TOTAL 27.32 kWp OF ON GRID CONNECTED ROOFTOP SOLAR PV POWER PLANT INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT (CMC) FOR 3 YEARS
Construction of 93M Length Motor Bridge at Govindghat in District Chamoli
Construction of 120M length pedestrian bridge to connect Malana village with KM 06 of Arakot Chinwa Balcha motor road under Vikaskhand Mori in District Uttarkashi
Construction of Animal Holding Area 130.45 Sq.Mt.
Construction of Interlocking and Drain work Sudarshan Nagar 96-1 Malin Basti in front of Chunniganj Ghante wale Mandir
Construction of Bituminous road Kapli Main road to Jasram Kuswahas House in ward 50
Construction of Interlocking road work from ward-27 Ashram Bamba to Lodhar Culvert
Supply, Installation, Commissioning and Testing of Automatic Fried Gram Plant (2 TPH) (Roaster Plant)
COMPLETE SEEDS PROCESSING PLANT 4 TPH FINISH GOODS CAPACITY With Colour Sortex
CIVIL WORK
Supply Installation Commissioning and Testing of Cleaning and Grading Unit 4TPH
Supply, Installation and Commissioning of Agricultural Machinery and Implements Tractor 50 HP, Power Tiller 13 HP, Rotavator 6 Ft, Cultivator and Two Bottom Hydraulic Plough
Supply Installation Commissioning and Testing of Fully Automatic Cleaning Grading Machinery 2 TPH
CONSTRUCTION SHED CLEANING, GRADING AND DAL MILL UNIT 106.94 SQ. M at JHEP MAHILA FARMER PRODUCER COMPANY LIMITED VADGAON PINJAR TQ BARSHITAKLI DIST AKOLA
Supply Installation Commissioning and Testing Of Cold Storage Based On Solar 30 MT and Pre Cooling 3 MT
SURVEY DESIGN FABRICATION SUPPLY INSTALLATION TESTING and COMMISSIONING OF TOTAL 91.17 KWP OF ON GRID CONNECTED ROOFTOP SOLAR PV POWER PLANT INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT (CMC) FOR 1 YEAR
Survey Design Fabrication Supply Installation Testing and Commissioning Of Total 15.00 Kw Of On Grid Connected Rooftop Solar Pvpower Plantincluding Comprehensive Maintenance Contract (Cmc) For 5 Years