Loading…
Loading…
589 results • Best match
Advance work Including Raising of Seedlings at BALEHALLI, Sy No 105, 82, Extent 25.00 Agumbe Range Head of Account NBM Or Other Budget Head
* The Provision for Soil Moisuture Conservation-Contour Trenches can be made by the Competent Authority, who sanctioned the APO, based on the Site Requirments. ** In case if the site requirment does not favour for the SMC Works, The savings amount can be utilised for the documentation works of the plantations
Advance work Including Raising of Seedlings at Hallusale Sy No 12, Extent 25.00 Ha Thirthahalli Range Head of Account KFDF Flexi Fund or Other Budget Head
* The Provision for Soil Moisuture Conservation-Contour Trenches can be made by the Competent Authority, who sanctioned the APO, based on the Site Requirments. ** In case if the site requirment does not favour for the SMC Works, The savings amount can be utilised for the documentation works of the plantations
Advance work Including Raising of Seedlings at KONAPURA Sy No 28, Extent 15.00 Ha Agumbe Range Head of Account NBM Or Other Budget Head
* The Provision for Soil Moisuture Conservation-Contour Trenches can be made by the Competent Authority, who sanctioned the APO, based on the Site Requirments. ** In case if the site requirment does not favour for the SMC Works, The savings amount can be utilised for the documentation works of the plantations
REJUVENATION OF URBAN WATER BODY/POND INCLUDING CLEANING, DESILTING, DREGDING, LAND SCAPING, BEAUTIFICATION AND PROTECTION WORKS BY STONE PITCHING RETAINING WALL ETC. UNDER 15TH FC TIED GRANT UNDER BONGAIGAON MUNICIPAL BOARD
Plantation (Coconut tree)
Raising of Teak plantation at Gundhichatnahalli Block IV, Sy No 39, Extent 4.00 Ha, Gundhichatnahalli Block V, Sy No 45, Extent 4.00 Ha and Gundhichatnahalli Block IV, Sy No 45, Extent 4.00 Ha Total 12.00 Ha Ayanur Range under DDF Head
13 82 FIRE PROTECTION WORK IN PLANTATION: NEW FIRE LINES: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 0.33 km/ha. 3,080.34 1 1,016.51
Raising of Teak plantation at Yarekoppa Block I, Sy No 36, Extent 4.50 Ha, Yarekoppa Block II, Sy No 36, Extent 4.00 Ha, and Yarekoppa Block III, Sy No 36, Extent 4.00 Ha Total 12.50 Ha Ayanur Range under DDF Head.
13 82 FIRE PROTECTION WORK IN PLANTATION: NEW FIRE LINES: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 0.33 km/ha. 3,080.34 1 1,016.51