Loading…
Loading…
542 results • Best match
Raising of 3000 Nos seedlings at Girgur Nursery / Kaggundi Nursery size of 14x-20 at Periyapatna Social Forestry Range during 2026-27
62.TM_ D.8.iii Planting, manuring, earth filing, application of insecticides, preparation of thawala i.e., soucer pit / ring basin, sticking for support of plant where ever required and watering atleast 5 Ltrs. Per plant after plantation 0.6x0.6x.06m Nos. 19.39 1 0
Raising of 2000 Nos seedlings at T.Narasipura /Mudukuthore / Neelasoge Nursery size of 14x-20 at T.Narasipura Social Forestry Range during 2026-27
62.TM_ D.8.iii Planting, manuring, earth filing, application of insecticides, preparation of thawala i.e., soucer pit / ring basin, sticking for support of plant where ever required and watering atleast 5 Ltrs. Per plant after plantation 0.6x0.6x.06m Nos. 19.39 1 0
Raising of 2000 Nos seedlings at Bandipalya / Nagawala Nursery size of 14x-20 at Mysore Social Forestry Range during 2026-27
62.TM_ D.8.iii Planting, manuring, earth filing, application of insecticides, preparation of thawala i.e., soucer pit / ring basin, sticking for support of plant where ever required and watering atleast 5 Ltrs. Per plant after plantation 0.6x0.6x.06m Nos. 19.39 1 0
Raising of 3000 Nos seedlings at Srikanteshwara / Behind Office Nursery size of 14x-20 at Nanjangud Social Forestry Range during 2026-27
62.TM_ D.8.iii Planting, manuring, earth filing, application of insecticides, preparation of thawala i.e., soucer pit / ring basin, sticking for support of plant where ever required and watering atleast 5 Ltrs. Per plant after plantation 0.6x0.6x.06m Nos. 19.39 1 0
Work of Augmentation of Water Supply Scheme for Ramganjmandi Town and Kudayla RIICO from Takali Dam Under CM Budget Announcement 2025-26 including 05 years OnM after 01 year of Defect Liability Period
Planting tress as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6m by grubbing and levelling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm yard/ sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering.:
Sewerage and Septage Management for sewer system with STP and laying, jointing, testing and commissioning of Sewerage System in two (02) ULBs of Cluster-4 including 1 year defect liability with 10 years O and M.
Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and