Loading…
Loading…
2,774 results • Best match
Design, Erection, Fabrication and Commissioning of Inspection Hut at Mansar, Block Majalta
Composite work of flowers/tree plantation at inspection hut including Supplying and stacking of good earth at site, Preparation... spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. Complete planting of seedlings /saplings & watering to the newly planted plants. Gap filling and application of insecticides, pesticide etc including water connection ...
Development of Jaleswar Pond in Ward No. 02
Plantation of tree saplings at site including excavation of pits of required size (typically 60 cm x 60... by volume (2 parts of earth reduced by 20% and 1 part of manure/sludge reduced by 8%), planting of healthy saplings, watering, dressing of surface, and removal of unserviceable material, ...
GENERAL Development works to Karippur Airport Approach road from km 0 000 to 2 000 From Kolathur junction to Airport Road Malappuram improvement work plus beautification work Phase I Part TS I Kondotty LAC General Civil Work
11.21:Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering
Beautification of town by installation of selfie points and Bus Stops.
Plantation work:- Providing & fixing of different types of trees as per the layout plan incl. digging of pits for trees/ shurbs with required inorganic/ organic manures/ river bed soil and fertilisers/ PP ...
Package No. CE/EAP/ADRHARDP/Corr_I/Pkg.3 Upgradation and 4-year maintenance of Corridor_1 From Km 98.000 (Thaiplungdisa) to Km 122.000_Dikrangso_Excluding the section from Km 100.950 to Km 105.400_4.450 km under ADRHARDP
D. Total Monitoring Cost Operation Phase Study of survival rate of trees (Plantation and Afforestation) at the end of O&M phase. It includes study of girth size of trees, species identification, tree numbering, geographical coordinate, etc. as per ESMP and as instructed by the PWRD.
Construction of 900KLD STP on Wetland Technology and Campus Boundary wall at Kankaha Mohanlalganj Lucknow
... Effluent Disposal drain/Channel, Interconnecting Piping with required Gates & Valves, Civil work for STP with supply & filling of required gravels, pump house, Bio-Media, Effluent treated water pipeline and Plantation/landscaping work, Boundary wall pump room and other Miscellaneous Works such as sewer ...