Loading…
Loading…
2,774 results • Best match
Erection of a High Tensile Fabric Canopy Structure at Rupali Traffic Junction, Power House Chhaka and Car Parking Shed at Janpath Bhubaneswar.
Plantation of Ornamental tree,palm,shruba and hedges at site including watering,removal of unservicable materials as per direction of HO incharge(excluding cost of plants&water) Cost of Planting Shrub
Development of Chitrakothi Pokhari at Unit -9 in Ward No. 35
Plantation of tree saplings at site including excavation of pits of required size (typically 60 cm x 60... volume (2 parts of earth reduced by 20% and 1 part of manure/sludge reduced by 18%), planting of healthy saplings, watering, dressing of surface, and emoval of unserviceable material, ...
SBM 2.0 2025-26 - STP
Site Clearence, Earth filling, levelling, Landscaping and plantation of tree saplings with all connected works etc complete as per specification
Construction of Polytechnic College at Minicoy Island, UT of Lakshadweep (Revised) (Re Tender-II)
Procuring and planting specified nursery grown trees, shrubs and other plants .Rates include plant cost,transport, cost of manure, planting, labour,supervision and maintenance for 2 months after planting. Jackfruit tree
NA Addl Amravati Indl Area PM MITRA Park Amravati Package I Providing Infrastructure Roads Water supply Network Street Lights Plug and Play Sheds Amenities like Security Command and Control Center with SCADA Admin Building and alli
... competent authority. The item also includes providing Three sets of Architectural/Structural work/Interior work Design & Drawing as per necessity of Command & Control center for execution of work along with soft copy Construction of Ground Floor (RCC design with Provision of Ground ...
Construction of RCC Bridges and development of the Bridge Approaches (CH 1 plus 290.00m to 2 plus 670.00m) connecting road between Ouguri and Amguri under Asom Mala 3.0 for the year 2025-26.
(C) TREE PLANTATION 'Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.