Loading…
Loading…
6,348 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing and Modification of 24V Alternator Test Bench, Auxiliary Alternator Test bench and EP magnet valve test bench at Rolling Stock Workshop, CB, Lucknow; Repairin..
AR and MO LWSS Padara Bajoha and Serti in GP Tharola Tehsil Kotkhai Distt Shimla HP SH Renewal of annual maintenance program for the remote management automation solution Gatisheel Agritech Private ltd for 5 Nos units installed at various LWSS under
NCTPS I Operation Circle Chemical Division Annual Maintenance work Testing of various water samples collection and testing in RO cum DM plant SWAS Panel and operational assistance in RO cum DM plant round the clock carrying out the works by entr
Comprehensive Annual Maintenance Contract (CAMC) of IC door (Make: Perfect techno) of Vande Bharat Rake No. 4 through OEM firm M/S Perfect Techno Consultants Pvt. Ltd. on single tender basis at Aishbagh Coaching Depot for a period of 02 Years.
Annual Maintenance of From L.P. road to Andhra Border via Iladoni, Kotaballapalli, Jonnapalli, Diguvapalli, Mallepalli, Nerapalli, Muttakapalli, Mariyampete, K. Vadigepalli, Karangi, Matakannasandra road chainage 0.00 to 23.50 km in Srinivasapura Taluk for the year 2026-27 (Reserved for Cat-II A).
Annual Maintenance of A) Imangala to Yaraballi road via Talavatti, Vaddikere road from Km 0.00 to 13.31 Km in Hiriyur taluk B) Janukonda to Burujanaroppa road via Godabanahal, Mahadevanakatte, Kennadalu, Chikkasiddavvanahalli, Burujanaroppa road from 20.69 to 29.10 Km in Hiriyur taluk
Custom Bid for Services - Maintenance of ICF Facility Ventilation & Emergency Power supply system, SS Double module glove box operation & recirculation systems (Qty: 3 nos) and Clean room System (Grade: ISO 10, 000, Class7) at IDEAS Section for a ... Category Repair , ... Repair, Maintenance and ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - REPAIRING & REWINDING OF VARIOUS TYPES OF MOTORS INSTALLED AT VARIOUS DTL SUBSTATIONS UNDER DGM(T) WEST-I FOR A PERIOD OF TWO YEARS; REPAIRING & REWINDING OF VARIOUS TYP..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per ATC and SOW; CAPITAL OVERHAULING OF TB 01 NOS AT TBS AS PER ATC AND SOW; As per ATC and SOW
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC of Hydraulic Systems at mining plants for 24 months as per the scope of work; as per scope of work