Loading…
Loading…
6,376 results • Best match
Resurfacing of Cement Concrete Road (Ch. 1.2/00 to 2.4/00 km) of Concrete Trimix from Matariya Chokdi to 1st Gate of Hadaf Irrigation Scheme Ta. Morva(H) Di.Panchmahal.
asphalt filler 20 mm size joints as per directed by EIC. The work includes
Road widening with a new flexible paved road, Re-surfacing laying paver blocks, construction of RCC drains, Culvert, Kerb stones, main gate and installation of street lights at Industrial Area Bettiah.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
ANNUAL RATE CONTRACT FOR RESURFACING/REPAIRING SAWORK OF EXISTING C.C./PAVER BLOCK ROAD DAMAGED DURING HEAVY RAINFALL FOR BARVALA NAGARPALIKA UNDER SJMMSVY MMSSY GRANT YEAR 202627
Neemtala Sansad via Gheedah and Singhi Road from 11 Km to 18_50 Km Surfacing work under Birbhum Division PWD in the District of Birbhum 2nd Call
Prime Coat Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For WBM / WMM Surface: (With cationic bitumen emulsion (MS, Packed) @0.85 kg/sqm)
Widening of Main Carriageway of 60 M wide road and Resurfacing of main carriageway and Service road from ATS Rotary to 130 m Rotary between Sector Eta-1 and Zeta 1, Greater Noida.
Prime Coat over WMM/WBM Providing and applying primer coat with bitumen grade VG-10 on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means. (MoRTH-20/502/AR)
Construction of Bitumen Road at various places in ward no.24
Construction of Bitumen Road at various places in ward no.24