Loading…
Loading…
26,465 results • Best match
REPAIRING OF POTHOLES AND CUTTINGS ON ROAD SURFACE IN DIFFERENT WARD UNDER BOROUGH -VIII.
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
Providing Earthern to BT surface road 1 No in Aranthangi Municipality (Package 1)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803 (HW-W0089)
Providing Earthern to BT surface road 1 NO in Aranthangi Municipality (Package 7)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803 (HW-W0089)
REPAIRING OF ROAD SURFACE WITH ALLIED WORK AT ARMENIAN ST (PS223) IN WARD NO -042
REPAIRING OF ROAD SURFACE WITH ALLIED WORK AT AMRATALA LANE ( PS225) IN WARD NO -042
Providing BT surface at srinivasa road extension at ward 26in Bhavani municipality
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications