Loading…
Loading…
26,466 results • Best match
REPAIRING OF ROAD SURFACE WITH ALLIED WORK AT ARMENIAN ST (PS222) IN WARD NO -042
Improvement of BT Surface at 169023R0383 Salkara Bakery Cross Road in Madukkarai Municipality
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
REPAIRING OF SURFACE DRAIN AT 141A/2A, ETC S.S. ROAD IN WARD NO-002
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
URGENT REPAIR OF POTHOLES, DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO. 55
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
URGENT REPAIR OF POTHOLES , DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO- 009.
URGENT REPAIR OF POTHOLES , DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO- 003.