Loading…
Loading…
26,477 results • Best match
URGENT REPAIR OF POTHOLES, DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO. 52
URGENT REPAIR OF POTHOLES, DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO. 47
URGENT REPAIR OF POTHOLES, DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO. 53
DEVELOPMENT OF ROAD SURFACE BY CEMENT CONCRETE IN PLACE OF ASPHALTUM ROAD SURFACE AT RAJA KALI KRISHNA 2ND LANE AND PASSAGE IN WARD NO-010, UNDER BR-II. (ID APAS/01/166/74/0001)
Reconstruction of Surface drain and adjucent Road from the house of Rabindranath Chakraborty to the house of Milan Roy, Reconstruction of Surface drain form the house of Shibu Atha to the house of Gurudas Chakraborty, Reconstruction of CC Road at Sub
Reconstruction of Surface drain and adjucent Road from the house of Rabindranath Chakraborty to the house of Milan Roy, Reconstruction of Surface drain form the house of Shibu Atha to the house of Gurudas Chakraborty, Reconstruction of CC Road at Subhankar Sarani Main Road and reconstruction of Surface drain and adjucent CC Road from the house of Ujjal Mandol to the house of Kuntal Babu at Subhankar Sarani area within Ward no 11 under Bankura Municipality.
Providing Earth to BT Surface to BHARATHI NAGAR 6TH CROSS ROAD 105034R1158 SACHITHANANTHA NAGAR 9TH CROSS ROAD 105034R1250 SACHITHANANTHA NAGAR 1ST CROSS ROAD 105034R1241 and Improvement of BT Surface to AMMAN KOIL ARASALARU VAZHI NADAPPU
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5