Loading…
Loading…
55 results • Best match
Design, Engineering, Supply, Transportation, Transit Insurance, Storage, Installation, Testing, Commissioning, Comprehensive All / Risk Insurance Coverage till Handing Over, Operation and Maintenance, and Warranty of 50 MWAC Grid-Connected Solar PV ... MWh Battery Energy Storage System BESS along ... Pooling System , ...
Setting up of 1500 MW/6000 (for 4-hour and &gt1 cycle ) MWh Standalone Battery Energy Storage Systems under Tariff Based Global Competitive Bidding in Rajasthan with/without Viability Gap Funding Support under “BOO” model.
Setting up of 250 MW/1000 MWh (for 4-hour and &gt1) cycle Standalone Battery Energy Storage Systems under Tariff Based Global Competitive Bidding in Rajasthan with/without Viability Gap Funding Support under “BOO” model.
PROCUREMENT OF 200 MW FIRM & DISPATCHABLE RENEWABLE ENERGY (FDRE) WITH ENERGY STORAGE SYSTEM WITH GREENSHOE OPTION OF CONTRACTING ADDITIONAL 200 MW
DEVELOPMENT OF A 200 MW GRID-CONNECTED GROUND MOUNTED SOLAR PHOTO VOLTAIC PROJECT WITH ENERGY STORAGE SYSTEMS (ESS) ASSURING 1200 MWh OF PEAK POWER SUPPLY
DEVELOPMENT OF A 50 MW GRID-CONNECTED GROUND MOUNTED SOLAR PHOTO VOLTAIC PROJECT WITH ENERGY STORAGE SYSTEMS (ESS) ASSURING 200 MWh OF PEAK POWER SUPPLY
Selection of Solar Power Developers for Setting up of 150 MW Solar PV Power Projects with 75 MW/300 MWh Energy Storage Systems (ESS) in the state of Bihar under Tariff-Based Competitive Bidding
Procurement of 50MW/100MWh BESS Power for 15 years for Tata Power Mumbai Distribution.
EPC PACKAGE FOR DEVELOPMENT OF 50 MW / 200 MWH BESS AT JHANSI (U.P.) OF NUGEL
Setting up of Standalone BESS of Capacity 265MW/530 MWh in the State of Harayana under VGF scheme