Loading…
Loading…
55 results • Best match
Development, Operation, Maintenance and Management of a 14.3 MW Ground Mounted PV Battery Energy Storage System 14.3 MW GPV BESS Integration at the Shankarraoji Chavan Vishnupuri Project a Public Private Partnership PPP basis
Procurement Pilot Based Small Scale Standalone Decentralized Battery Energy Storage Systems BESS systems along with CMC for the period of 12 Years(06 years warranty and 06 years maintenance contract) at the DT Level in JdVVNL under TNDSM 117
... work & Commissioning of BESS systems along with CMC for ...
Request for Selection (RfS) Document for Selection of Solar Power Developers for Setting up of Grid-Connected Solar PV Projects with Battery Energy Storage System (BESS) in Lakshadweep Through Tariff Based Competitive Bidding
... (13.5MW)+Wind Power Plant (1500KW)+ BESS (48.52MWh) for Kavaratti ...
Selection of Solar & BESS Power Developers for Setting up of 17 MW- InSTS connected Solar PV Power Projects with 12.5 MW/50 MWh Battery Energy Storage Systems (BESS) on vacant Railway Land at Dahod in Gujarat, India under Tariff-based Competitive Bidding
Expression of Interest (EOI) for Development Operation Maintenance and Management of Floating Solar PV Plus Battery Energy Storage System (FSPV plus BESS) project on the Ekrukh Reservoir on a Public Private Partnership (PPP) Basis
Expression of Interest EOI for Development, Operation, Maintenance and Management of 170 MW Floating Solar PV Battery Energy Storage System 170 MW FSPV BESS Project on the Reservoir Surface of Upper Penganga Project Dist. Yawatmal
Design Supply Testing Installation and Commissioning of 20 pilot based small scale standalone decentralized Battery Energy Storage Systems BESS projects of 100 kW 200 kWh with 5 year CAMC at Distribution Transformer level on CAPEX mode in JVVNL
Development Operation Maintenance and Management of a 115 MW Floating Solar PV plus Battery Energy Storage System 115 MW FSPV plus BESS Project on the Reservoir Surface of Manjara Dam Ta Kaij Dist Latur on PPP Basis
Development, Operation, Maintenance and Management of a 150 MW Floating Solar PV PLUS Battery Energy Storage System 150 MW FSPV PLUS BESS Project on the Reservoir Surface of Mula Major Dam Ta. Rahuri, Dist. Ahilyanagar on PPP Basis.
Request for Selection (RfS) Document for setting up of Projects of 1000 MW / 4000 MWh Standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Competitive Bidding (Phase-X)