Loading…
Loading…
2,003 results • Best match
Providing New Borewell, 5HP Motor with Panel Board in Athiyur at Sithandi Panchayat in Madhuranthagam Block under Union General Fund for the year 2026-27
Drilling of 150mm dia bore well in hard rock area to any depth including labour charges for inserting casing pipe assembly in the drilled hole including transporting charges for the Rig and supporting vehicles from one place to another place.
Construction 02 nos New Borewell along with necessary connection for Hospital Quarters at Sagardishi SSH Hospital Campus, Murshidabad during the year 2025-26 2nd call
Construction 02 nos New Borewell along with necessary connection for Hospital Quarters at Sagardishi SSH Hospital Campus,Murshidabad during the year 2025-26 2nd call
Sinking of Borewell at STP at Mullur road at the place indicated by geologist and errection of motor pump arranging power supply of CMC Kollegal
Sinking of Borewell at STP at Mullur road at the place indicated by geologist and errection of motor pump arranging power supply of CMC Kollegal
SPL REPAIR TO BOREWELL AT PUMP HOUSE-I AND PUMP HOUSE -VI AND REPAIR TO FILTER MEDIA AND PUMP HOUSE NO 3 AT AFS TEZPUR
Supply and filling pea gravel of size 3 to 8 mm for paking around the housing /assembly,slotted pipe of the bore well complete all as specified and as directed. Note:- (i) Pea gravel shall be paid as per stack measurment carried out on site . (ii) Contractor shall also produced the original purchase voucher for gravel. (ii) Contractor shall provide the proper hard standing for stacking of the gravel and unit rate of this item also includes the cost of this factor and nothing extra shall be admissible . (iv) After filling the gravel around the pipe, remaining gravells shall be removed by the contractor at his own cost and balance material / gravel will be deducted from the gross qty for measurement purpose.(FOR TWO NOS BOREWELL)
OPERATION AND MAINTENANCE OF TUBEWELL PUMPHOUSE , Valve AND PIPELINE RWSS UNDER JEN SEC. NAPASAR - II (Near Napasar) UNDER SUB DIV. DESHNOK
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. (For Rural Scheme where three phase electric supply is up to 8 hrs)
Drilling of tubewell by FDR machine and providing and installation of single phase motor pumps at various places (02) in ward no. 20
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. UADD SOR 20.1/254