Loading…
Loading…
2,195 results • Best match
AS PER BOQ
Boring/drilling 200mm dia. Borewell, upto 140 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately)
NER-LJN Division;- Balrampur: Provision of cover shed for 06 wagon capacity (50x10m) Sqm & 02 nos. labour shed (03x05)Sqm.
D-NS Items (Tubewell work)
Const of tubwell Bauri para At Dhansa Under Mongaldihi G.P code-114655286
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre. (ii) 80 mm dia. boring etc.
Construction of Submersible at Kanur Hapijul Mollick house Under Ghurisha G.P code-112212086
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre. (ii) 80 mm dia. boring etc.
Installation of new submersible with pipeline at Goltikuri CSC under Bilati GP. Code-113958703
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre. (ii) 80 mm dia. boring etc.
K-2 A/mtc of EPHS in various Sector UE Karnal
[20.54.4]Providing GI pipes class B marked with IS: 1239 in 3.05 m length, their threading and welding with flanges (Heavy Duty) on both sides, jointing with nuts and bolts ( ‘W’ make), rubber gaskets , lowering into Tube wells and testing including carriage, loading, unloading etc. complete in all respects to the satisfaction of Engineer-in- Charge. 4. 100 mm i/d