Loading…
Loading…
2,202 results • Best match
K-2 A/mtc of EPHS in various Sector UE Karnal
[20.54.4]Providing GI pipes class B marked with IS: 1239 in 3.05 m length, their threading and welding with flanges (Heavy Duty) on both sides, jointing with nuts and bolts ( ‘W’ make), rubber gaskets , lowering into Tube wells and testing including carriage, loading, unloading etc. complete in all respects to the satisfaction of Engineer-in- Charge. 4. 100 mm i/d
Operation and maintenance of 73 nos. Integrated water supply scheme of Canning - II, Bhangore - I and II Block under Canning Sub-Division under Alipore Division, P.H. Engineering Dte. (for 6 months) (2nd Call)
Surging of existing tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the tube well with compressor machine at least 3 (three) days at 8 (eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by 'V' notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the Public Analyst is to be obtained. (The rate is inclusive of all labour and materials including hire charges of tools and plants and cost of materials.) (a) For tube well from 40 mm to 100mm top enlarged to have yield from 1500 to 3000 gallons per hour as per size and yield.
Operation and maintenance of 68 nos. Integrated water supply scheme of Canning-I Block under Canning Sub-Division under Alipore Division, P.H.E Dte. (for 6 months) (2nd Call)
Surging of existing tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the tube well with compressor machine at least 3 (three) days at 8 (eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by 'V' notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the Public Analyst is to be obtained. (The rate is inclusive of all labour and materials including hire charges of tools and plants and cost of materials.) (a) For tube well from 40 mm to 100mm top enlarged to have yield from 1500 to 3000 gallons per hour as per size and yield.
Engaging of Man Mazdoors Daily wage basis for Leak worker, ,Cleaning of Clear water Sumps and ELSR's , Bore well repair complaints and Street Lighting Complaints closing for 11 Months in Div No.43,44,45, and 49 under AE-03 Section of GMC.
Engaging of Man Mazdoor Dialy wage basis for Leak Worker, Cleaning of Clear Water Sumps and ELSR's, Borewell repair complaints and Street Lighting Complaints for 6months in Div No.43,44,45 and 49 under AE-03 Section of GMC
Augmentation of Water Supply Scheme Village Nanak Nagri in Block Phagwara, District Kapurthala (Under head NABARD XXXI/State Share/4215)
Providing and installing 100mm dia delivery main (From Tube well to Duck Foot bend including cost of D.I/D.F Pipes, D/F Sluice valves, D/F NRV & Specials as D.I Bends, Tail Piece Tees etc. inside the pump chamber as per standard design complete in all respects
CONSTRUCTION OF DOG SHELTER AT KALA PANI (300 DOGS).
3000018297-Development of Tube well with help comp