Loading…
Loading…
2,206 results • Best match
Mtc of Switch, Kit, kat (63Amp - 100 Amp) , ceiling fan, Starter oil, Panel Board complete (Starter, Ampere meter, volt meter etc.) Submersible cable of size 4 sqmm to 12 sqmm aluminnium cable from elect. pole to Panel board for tubewells and 16mm to
-Mtc of Switch, Kit, kat (63Amp - 100 Amp) , ceiling fan, Starter oil, Panel Board complete (Starter, Ampere meter, volt meter etc.) Submersible cable of size 4 sqmm to 12 sqmm aluminnium cable from elect. pole to Panel board for tubewells and 16mm to 25 sqmm for boosting station etc. UGT, with painting work etc. repair of AC/PVC/DI, GI pipe line consumable items i.e. Grease, Cotton, Rubber sheet, Nut Bolts, Lubricating Oil , Glan Dori , lowering and lifting of submersible motor pump, including cartage loading and unloading, chainpully, Repair/ replacement/ increasing of G.I. lowering pipe of size 50 mm to 80 mm, disconnecting of illigal connection and regularise connection with ferrule connection with repair and replacement of NRV,Sluice Valve from Tubewell and B/Station delivery to the Tailend of pipeline along with Leakage repair, Jointing of All DI Pipeline (AC/PVC/DI/GI Pipes) etc complete in all respect with the entire satisfaction of the Engineer-in-Charge and all other works contingent thereto.` (O and M for 3rd Year)
AMC for all types of Pumps, Metro Railway, Kolkata for 5 years
2-Break Down Maintenance of Dewatering & Tube well Pump as and
Providing, Installation, Testing and Commissioning of Electric Chain Pulley Block of 5 Ton Capacity along with allied electro-mechanical works to be installed at T/well Dental College under JMC Capex (New Works) 2026-27.
Providing, Installation, testing and commissioning of Electric Chain Pulley Block of 5 Ton capacity alongwith allied electromechanical works to be installed at Tube Well Dental College as per following specification:- Electric chain hoist are designed as per IS:- 6547 Capacity:- Hoisting speed Mt/min:- 2Mtr/min HP of the motor:- 2 HP Construction:- Hoist should be of unique modular construction which makes them an ideal choice since each sub assembly is easily accessible individually, thus reducing the time and cost involved in the maintenance. Frame:- The frame is of sturdy design, fabricated from tested steel plates and is welded/bolted type. Gear Box:- Totally enclosed gear box with gears made from EN-9/EN-24, steel and teethed on precision hobbing machine, hardened and tempered. The gears are le and need no further lubrication. Electric Motor:- 3 Phase, 440 volt AC 50 cycles, squirrel cage induction motor. Load Chain:- Conforms to IS:- 6216-1971, Grade 80, Tested, Calibrated and duly heat treated. Brake:- Instant action fail to safe, electromagnetic disc brake are incorporated to ensure maximum safety and reliability in operation. Unit Switch:- Snap action limits switches are used to prevent over hoisting and over lowering. Control Panel:- Totally enclosed dust and moisture proof panel housing with components of standard makes provides control at low voltage for safety of operator. Hooks:- Steel forge conforming to IS:- 8610-1977. Free to rotate and swivel. Test:- Each hoist is tested to 25% over load with conformation to IS:- 6547-1971. Job also include providing, installation, testing and commissioning of MCCB (switch fuse unit) 4 pole of 250 ampere and 95 sq.mm Aluminum armoured cable 3.5 core 10 mtrs. in length with MCCB of 200 ampere (4 pole) for L.T. Control Panel alongwith allied works to be installed at Tube Well Dental College.
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village DONI Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and d
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village doni Block bhitarwar Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and distribution pipe line system, oht household tap connections, construction of pump house, (As Per BOQ) and construction of RCC sumpwell (As Per BOQ) electric power connections at tubewell including cost of all material And labour with 90 Days After completion of construction/ Execution of work with Sucessful testing and comissioning period of entire scheme.. as per boq
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village ERAYA Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village ERAYA Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and distribution pipe line system, household tap connections, construction of pump house, (As Per BOQ) and construction of RCC OHT (As Per BOQ) electric power connections at tubewell including cost of all material And labour with 90 Days After completion of construction/ Execution of work with Sucessful testing and comissioning period of entire scheme. As per boq
Supply and Delivery of Hand pump set spare parts for Maintenance of Bore Wells at Various Areas (CR Nagar, pothuru, Chowdavaram) in Div.No.26.
Supply and delivery of Borewell hand pump spares specials and tools including cost and conveyance to site etc.,