Loading…
Loading…
2,175 results • Best match
Providing, Installation, Testing and Commissioning of 12000 GPH X 76 Mtrs head Submersible Pump set as standby along with allied works at T/well Press Club under District Capex Budget 2026-27.
Providing, Fitting, Installation, Testing and commissioning of 1 No. submersible pump sets of specification 12000 GPH x 76 mtrs at Tube Well Press club by way of fabrication and fitting of. U-shaped tie rod/clamp which is to be fabricated out of MS flat and to be fitted with submersible pumps by fabrication and fitting of bolts and nuts which are to be welded on both sides of the clamp. The job also includes fabrication of expander / reducer nipples for NRV of required size which is to be fabricated out of MS plate threaded at one end and flanged at the other end. Coupling the pump and motor and testing the pump set and testing It in test pit in workshop and Shifting to site of work. Installation, Testing and commissioning of Submersible Pump set extracting of already lowered pump set along with submersible cable and column pipes. Making of Connections of Submersible cable with motor Leads and lowering of Submersible Pump set, Material i.e. Tie rod, Expander Reducer, Nipple, Nuts, Bolts Rubber Sheets, Main Switch and Labour Charges. Complete Job. The job also include Providing of 16 sq mm submersible cable 50 DMT (stand by). The job includes the cost of all type of material such as submersible pumpset, submersible cable, Rubber sheets joints, nuts and bolts, and labour charges for carriage of pump set. Complete Job
PIPE LINE DALNE KA KARYE JODHPURA
Providing & Lowering in tube well ISI marked GI pipe medium duty ("B" class) steel tube as per is 1239 or amendd up to date and zinc coating as per IS 4736, threaded and double flanged (welde) on both ends nut bolts etc. complete in all respect. 80 mm dia
Annual Tender for 2026-27 Water Supply repair worksin Achirapakkam Town Panchayat
Attending repairs to the India Mark II Deep Borewell Removal Charges for India Mark II Deep Borewell
Repair and Mtc. of leakage of various Water Supply Valves including rewinding of pumps/ motors and various electrical components etc at Boosting Station at Block-A,B,C,D and L under GMCH-32, Chandigarh
Repair & Rewinding of 25 to 30 HP submersible motor with 14 stage pump including repair/replacement of various parts such as housing bush, rotor sleevs, sand guard, flange lock, sub cable, thrust bearing , thrust plate,motor bush, seal bush, connection piece and repair of sub pump including repair/replacement of various parts such as bowl bush, neck ring, pump shaft, impeller, NRV and coupling complete in all respect. FOR BLOCK - For tubewell boring
Engagement of Special Third Party Independent Techno Financial Auditor for Techno Financial Audit SBM 2.0 and UIDF under the jurisdiction of Punjab Water Supply and Sewerage Division No. 2, Patiala.
2 Providing Sewerage, Water Supply, dismantling and reconditioning of roads, house connection in remaining area of Sirhind, Construction of 2.00 lakh GLS capacity OHSR and 2 Nos. Tubewell at Sirhind Distt. Fatehgarh Sahib. 0
Construction of CCT, MPT, PT, ECD, Recharge Shaft and Sunken Pond in MJSA 2.3 Block Ramgarh (Package No. 03)
Construction of TUBE-WELL upto 100m depth and above in all type of rocks by DTH system and over burden to accomodate casing pipe of following size in all type of soils and over burden including lowering of casing pipe but excludind cost of casing pipe as per IS 2800 (part I & II ) 1979 spwcifications . The work should be completed after obtaining sand free water . The tube well should have a throughout bore as per nominal dia of casing pipe. 250 mm dia Nominal size (minimum bore size of 250 mm )