Loading…
Loading…
2,175 results • Best match
Construction Of Rain Water Harvesting, Toilet and Gurad Room Of Ganga Jal Campus R-10 Sector- Golf Course, Greater Noida.CAMPUS R-10
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR-18/23.12
REPAIRS REPLACEMENT MAINTENANCE TO DI GI CI PIPE LINES FITTINGS PUMPING SETS SERVICING OF WATER TREATMENT PLANT UG TANKS CLEANING AND CONNECTED WORKS AT CABS STIR AND CEMILAC UNDER GE I RAND D EAST BANGALORE
Material and labour for desilting / cleaning of bore well including taking out and lowering of new / repaired submersible pump set of any size (5 HP to 17.5 HP), 3 phase 400 / 415 Volts in 200 / 250 mm size tube well up to existing depth of bore comprising following nature of work.
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Job work for comprehensive maintenance of pumping machinery i.e. all Horizontal pumping set and Motor installed of various capacity, tubewell submersible motor of various capacity, starter with control panel ( if panel has been burnt than it will be repalced with new panel by agency) Cable, volt meter, amp. meter and other electric Items i.e. Fan, LED bulb, Board, electric fitting, wiring etc at all water works/ Boosting stations, including proper lubrication and packing of glands, all Consumeable i.e. Bush, cottong, Galain Dori, Grease, Lubericant Oil, Mobile oil, nut bolt, rubber sheet, transformer oil etc. at Water Works/Boosting Stations, including repair of transformer, DG Set and repair of sluice valve, NRV ( if NRV, sluice valve is not repairable than it will be replaced with new , NRV, sluice valves by agency) at all water works/ Boosting Stations for proper functioning under the jurisdiction of water supply scheme complete in all respect up to the full satisfaction of the Engineer-in-Charge
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Job work for comprehensive maintenance of pumping machinery i.e. all Horizontal pumping set and Motor installed of various capacity, tubewell submersible motor of various capacity, starter with control panel ( if panel has been burnt than it will be repalced with new panel by agency) Cable, volt meter, amp. meter and other electric Items i.e. Fan, LED bulb, Board, electric fitting, wiring etc at all water works/ Boosting stations, including proper lubrication and packing of glands, all Consumeable i.e. Bush, cottong, Galain Dori, Grease, Lubericant Oil, Mobile oil, nut bolt, rubber sheet, transformer oil etc. at Water Works/Boosting Stations, including repair of transformer, DG Set and repair of sluice valve, NRV ( if NRV, sluice valve is not repairable than it will be replaced with new , NRV, sluice valves by agency) at all water works/ Boosting Stations for proper functioning under the jurisdiction of water supply scheme complete in all respect up to the full satisfaction of the Engineer-in-Charge
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Job work for comprehensive maintenance of pumping machinery i.e. all Horizontal pumping set and Motor installed of various capacity, tubewell submersible motor of various capacity, starter with control panel ( if panel has been burnt than it will be repalced with new panel by agency) Cable, volt meter, amp. meter and other electric Items i.e. Fan, LED bulb, Board, electric fitting, wiring etc at all water works/ Boosting stations, including proper lubrication and packing of glands, all Consumeable i.e. Bush, cottong, Galain Dori, Grease, Lubericant Oil, Mobile oil, nut bolt, rubber sheet, transformer oil etc. at Water Works/Boosting Stations, including repair of transformer, DG Set and repair of sluice valve, NRV ( if NRV, sluice valve is not repairable than it will be replaced with new , NRV, sluice valves by agency) at all water works/ Boosting Stations for proper functioning under the jurisdiction of water supply scheme complete in all respect up to the full satisfaction of the Engineer-in-Charge
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Job work for comprehensive maintenance of pumping machinery i.e. all Horizontal pumping set and Motor installed of various capacity, tubewell submersible motor of various capacity, starter with control panel ( if panel has been burnt than it will be repalced with new panel by agency) Cable, volt meter, amp. meter and other electric Items i.e. Fan, LED bulb, Board, electric fitting, wiring etc at all water works/ Boosting stations, including proper lubrication and packing of glands, all Consumeable i.e. Bush, cottong, Galain Dori, Grease, Lubericant Oil, Mobile oil, nut bolt, rubber sheet, transformer oil etc. at Water Works/Boosting Stations, including repair of transformer, DG Set and repair of sluice valve, NRV ( if NRV, sluice valve is not repairable than it will be replaced with new , NRV, sluice valves by agency) at all water works/ Boosting Stations for proper functioning under the jurisdiction of water supply scheme complete in all respect up to the full satisfaction of the Engineer-in-Charge