Loading…
Loading…
2,005 results • Best match
Provision of new Tube-well for augmentation of water supply in BSNL staff Colony Sector - D Aliganj Lucknow.
Development of tube well in accordance with IS : 2800 (part I) and IS:11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
SITC of Chemical Dosing Pump at various Tube well under AC-60.
Supply of electronic Chemical dosing pump complete with Injection valve assembly, Suction valve assembly PVC tubing. Capacity PVC dosing media container etc. Capacity: - 6.0 LPH Pressure: - 7.0 kg/cm2 Make: - "Clomax" /" Milton Roy
CHANGING OF ROTTEN RISER PIPE IN I M II DRILLED TUBE WELL WITH 32 MM MEDIUM CLASS GI PIPE AND CONNECTING ROD FOR DRILLED TUBE WELL IN DIFFERENT BLOCK OF CHATRA DISTRICT GR CTR RRP 06 2ND CALL
Labour Component Supplying of one no. fitter/Tube well mistri three nos. Helper unskilled labour for repairing of Hand Pump in different habitation in Chatra District as per direction of E/I.
Construction of Gravel Packed Production Tube Well at Water Supply Scheme Arakhashi Pora District Anantnag.
Development of tube well in accordance with IS: 2800 (Part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by V-Notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory all complete including required hire and labour charges of air compressor, tools and accessories etc. all as per direction of Engineer-in-charge.
Operation, Maintenance and Electrical Repair of 187 Tube wells Falling under Zone 4,4A and 8 of West Constituency for the Period of 1 Years
1 Operation, of 187 Tube wells Falling under Zone 4,4A & 8 of West Constituency for the Period of 1 Years Total Amt 1476114-00 Fixed Amount for Operation Estimate = Rs 1445040-00 Bidder Can Quote only On 2.5% Contactor Profit Amount of Rs 31074-00 (SUB HEAD I) GST will be paid as per Govt. norms 1445040 1445040
Drilling of Tube well at Ward no. 01, 03, 04 ,05, 06, and 07 in nagar parishad Bilahra
Drilling of Tube well at Ward no. 01, 03, 04 ,05, 06, and 07 in nagar parishad Bilahra