Loading…
Loading…
2,189 results • Best match
REPAIR/MAINT OF WATER SUPPLY DISTRIBUTION NETWORK SYSTEM PIPE LINE WITH FITTINGS AT POCKET I AND REPAIR/MAINT OF VARIOUS CAPACITIES OF PUMP SETS, EARTHING AND CONNECTED WORKS AT CHAF BANGALORE
M&L for Desilting/ cleaning of borewell including taking out and lowering of new/repaired submersible pump set of any size (5 HP to 12HP), 3 phase 400/415 Volts in 200/250 mm size tube well up to existing depth of bore complete all as specified and directed comprising following nature of work :- Dip connection existing pipe connection any size and removing electric connection. Erection of tripod/chain pulley block at site . Unscrewing the submersible pump and removing the same at site for relowering. Transporting the troly mounted DTH machine at site for flushing the bore well/further boring if required. Flushing the bore hole through compressor operating 120PSI after lowering the rig in length 1.5 mtr x 80 Nos continuously till clear water obtained not less than 6 hrs
Construction of Market with Toilet and Water facilities at Baregaon in Kamrup District under RIDF XXXI
Boring with 100 mm diameter casing pipe for hand pump / tubewell, in all soils except ordinary hard rocks requiring blasting, including removing the casing pipe after the hand pump / tube well is lowered and tested : Up to 6 metres depth
Construction of New Public Library, Jankipuram Lucknow.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
CONSTRUCTION OF 03 (THREE) Nos. PANCHAYAT SARKAR BHAWAN IN VILL - KARARIYA MAUJA - KARARIYA, VILL - BARHARWAKALA PASCHIM MAUJA - BARHARWA KALA AND VILL- BHOPATPUR UTTARI MAUJA - BHOPATPUR AT BLOCK KOTWA IN THE DIST - EAST CHAMPARAN FOR THE YEAR - 2026-27.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
CONSTRUCTION OF SUBDIVISION PROSECUTION OFFICE BUILDING AT BIKRAMGANJ IN THE DISTRICT OF ROHTAS WITH ELECTRIFICATION
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Padini kanya mahavidyalay mahmurganj ke atithi grih me 02 kamaro ka nirman, shauchalay avm snanagar sahit avm purva me nirmit 02 kamaro me shauchalay avm snanagar iske sath samarrsibal sapat pin, pani ka prabandhan v nikasi sahit sampurn atithi grih
Development of tube well in accordance with 1S : 2800 (part I) and IS: 11189, to establish maximum rate of useable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, including disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories efc., all as per requirement and direction of Engineer-in-charge.I/c as per dsr 2023 code 23.12