Loading…
Loading…
2,190 results • Best match
Construction of New PHC Building at Burja (Block Malakhera) Distt. Alwar
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS:2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe :
Augmentation and Rehabilitation of Distribution Network, Repairing Work of 5 nos. OHSRs and Providing Tap connections of Water Supply Scheme at Bagha Purana Town, Dist. Moga under AMRUT 2.0 Scheme
Nihal Singhwala Town: Estimation for Drilling of Tube Well (04 No's x 100 Mtrs.)
CONSTRUCTION OF TRAINING CLASS ROOM AT POLICE LINE SAHARSHA IN THE DISTRICT OF SAHARSHA WITH ELECTRIFICATION
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
REPAIR AND RENOVATION WORKS FOR SETTING UP OF SU SWASTHYA KENDRA AT BAJITPUR SC, SUTI-II , MURSHIDABAD
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (c) For depth upto 150 metre for 50 mm dia. Tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.
Improvement to PH work of CP Fitting and Fixture at all floor of Academic Block of Govt. Polytechnic Sambalpur Buildings.
Construction of 2nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessoriesLabour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore onlyDrilling of 200mm dia bore00 mtr to 30mtr
Janpad Siddhartha Nagar Vikas Khand Badhni ke Gram Panchyat Aurahwa Mein Barat Ghar /Utsav Ghar/Samudayik Kendra Nirman Karya
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR 23.12