Loading…
Loading…
2,190 results • Best match
Construction of Market Shed With Toilet Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Kurgi, Itki, Kanke, Ranchi
Development of tube well in accordance with IS : 2800 (part I) andIS: 11189, to establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessoriesetc., all as per requirement and direction of Engineer-in-charge
Construction of Market Shed With Toilet, Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Sons Bazartand, Chanho, Ranchi
Development of tube well in accordance with IS : 2800 (part I) andIS: 11189, to establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessoriesetc., all as per requirement and direction of Engineer-in-charge
CONSTRUCTION OF BPHU (BLOCK PUBLIC HEALTH UNIT) IN URBAN PHC HATIYA GARDEN, LOHARDAGA DISTRICT- LOHARDAGA
Development of tube well in accordance with IS : 2800 (part I) andIS: 11189, to establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessoriesetc., all as per requirement and direction of Engineer-in-charge
Construction of Sales building, Paver Driveway, and Other allied Civil, Mechanical and Electrical works at Kulpi Filling Enterprise, Paschim Srinagar, PS-Ramkrishnapur, Dist- South 24 Parganas under Kolkata DO of WBSO
Construction of Sales building, Paver Driveway with WMM and GSB, Box culvert, catch drain , supply and installation AIR facilities , borewell with submersible and Other allied Civil, Mechanical and Electrical works at Kulpi Filling Enterprise, Paschim Srinagar, PS-Ramkrishnapur, Dist- South 24 Parganas under Kolkata Divisional Office of West Bengal State Office.The item wise details of complete IOCL Specifications, rates, terms and conditions mentioned in attached tender documents and Purchase Requisition No. 10253144.
Construction of RCC (G Plus 3) Judicial Officers (Grade II) Quarter with Ground Floor Parking Facility at Golaghat
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
C/O WATER SUPPLY SCHEME AT WARODA TAL. RAJURA
Sub Work -1 Construction of Tube Well Item No.1: Drilling 300 mm dia Tube Well