Loading…
Loading…
2,190 results • Best match
Gram kaili mai sarvjanik karyakram hetu samudayik Kendra ka nirman karya
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Gram Mau Khas Block-Rajpura mai purana panchyat ghar (Khandar) ke sthan par sarvjanik karyakram hetu samudaik Kendra ka nirman karya
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Gram bhawanpur mai samudayaik swasthya Kendra ke pass sarvjanik karyakram hetu samudaik Kendra ka nirman karya
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Under District Bahraich, Construction of chamber (hall) for the sitting of advocates in the premises of Tehsil Payagpur, Lot No 1
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge., Sch No. (DSR 23.12
Construction of Anganwadi Centre at Bamanheruwa Village Bamanheruwa GP Aragundi, Block Latehar District- Latehar
Development of tube well in accordance with IS : 2800 (part I) andIS: 11189, to establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessoriesetc., all as per requirement and direction of Engineer-in-charge
Carrying out Zone works for period ending 30.06.2027 on Zone No-6 Mech. Workshop including workshop administrative building and store depot Izzatnagar.
Development of Tube Well by OP unit of 3 Hour cusec capacity and testing of tube well for yield.