Loading…
Loading…
2,208 results • Best match
Construction of 50 seated ST Girls Hostel at MGHS Kadamdihi, under Lakhanpur Block
Construction of 1 nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hamer drilling rig or combination rig with pvc pipe and installation of submersible pump set with all acessories Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the engineer in charge including use of own rig with its accessories ,tools and plant and consumables etc for lowering of 200mm/150mm dia G.I.P.V C/M.S casing pipes for housing fitted with socket and with or without well screen as for the necessity for soft ,medium,hard and boulder formation( G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well) 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore (1 nos ) 00mtr to 60mtr
Construction of Sub District Hospital at Amet District Rajsamand
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore.
Repairing of toilet block of old and new hostel of Nursing Training School at Barasat under Barasat Division, P.W.Dte., North 24 Parganas.
Repairing chocked up tube well by cleaning and washing with chemical including pumping with powerful pump. 40 mm to 50 mm dia. tube well upto 100 metre deep
Construction of Control Room Building and other Civil Works for New 33/11 KV Substation Sharda City Distt. Rampur
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Construction of Control Room Building and other Civil Works for New 33/11 KV Substation Aarsal-Parsal Distt. Rampur
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Construction work of digital library under Municipal Corporation Meerut under Chief Minister Global Nagarodaya Yojana.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.