Loading…
Loading…
2,189 results • Best match
Providing irrigation facilities through borewells to the lands of 1) Kariyaiah s/o Thimmaiah aliyas Javaraiah of Kodihalli village, 2) Lalithamma w/o Rajaiah of Mudlapura village, 3) Ramaiah s/o Saganaiah of Kittanakere village, Dudda Hobli, Hassan Taluk, Hassan Dist.
Providing irrigation facilities through borewells to the lands of 1) Kariyaiah s/o Thimmaiah aliyas Javaraiah of Kodihalli village, 2) Lalithamma w/o Rajaiah of Mudlapura village, 3) Ramaiah s/o Saganaiah of Kittanakere village, Dudda Hobli, Hassan Taluk, Hassan Dist.
Providing irrigation facilities through Borewells to the lands of 1)Lakshmaiahs/oKariyaiahofKyathanahalli(v)2)Shashikalaw/oManjunatha3)Bhadrammaw/oRamaswamy4)Manjunathas/oAnnabhovi5)Nandeeshas/oGiriyabhoviofKB.Palya(v)Halekote(Ho),6)Erammaw/oAnnappa7)Puttaswamys/oJavaraiahofChittanahalli(v)8)Swamys/oGiriyabhovi9)Thimmaiahs/oDasabhoviofChikkabyagathavalli(v)10)Dhanalakshmiw/oBasavarajuofLakkur(v)11)Jayammaw/oDoddaiahofHaralahalli(v)12)Nandeeshas/oDyavaiahof K.byadarahalli(v),HNP(Ho)(TQ)Hassan(D)
Providing irrigation facilities through Borewells to the lands of 1)Lakshmaiahs/oKariyaiahofKyathanahalli(v)2)Shashikalaw/oManjunatha3)Bhadrammaw/oRamaswamy4)Manjunathas/oAnnabhovi5)Nandeeshas/oGiriyabhoviofKB.Palya(v)Halekote(Ho),6)Erammaw/oAnnappa7)Puttaswamys/oJavaraiahofChittanahalli(v)8)Swamys/oGiriyabhovi9)Thimmaiahs/oDasabhoviofChikkabyagathavalli(v)10)Dhanalakshmiw/oBasavarajuofLakkur(v)11)Jayammaw/oDoddaiahofHaralahalli(v)12)Nandeeshas/oDyavaiahof K.byadarahalli(v),HNP(Ho)(TQ)Hassan(D)
Drilling of borwell and providing and fixing of pipe line at swm site
Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by pting Venner or S...
Construction work of digital library under Municipal Corporation Meerut under Chief Minister Global Nagarodaya Yojana.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
SITC of Fire Fighting System including Aerosol based Fire Suppression System and Lightning Arrester in SDH, Maithili of Malkangiri Dist. during 2025-26
Borewell Construction of 1no. production well including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories .Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr
SITC of Fire Fighting System including Aerosol based Suppression System and Lightning Arrester in SDH, Chitrakonda of Malkangiri Dist. during 2025-26.
Borewell Construction of 1no. production well including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories .Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr