Loading…
Loading…
2,191 results • Best match
Construction of Control Room Building and other Civil Works for New 33/11 K.V. Sub-Station Rajendra Nagar-3, Distt. Ghaziabad
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.(DSR. 23.12 (Civil)
Construction of Farmer Residance, Micro Biology Lab and Bio Pesticide Lab Under SADP at Agriculture Science Center, Ganiva, Distt. Chitrakoot
Tube Well work Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre below ground level. 300 mm dia (beyond upto 90 metre ground level.)
Construction of 100 seated building at RBD HS Campus, Municipality, Deogarh, Odisha
BOREWELL 10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Augmentation of Piped Water Supply Scheme of Village Kishanpura GP Kishanpura for providing functional household tap connections under JJM, Tehsil Chomu, District Jaipur
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Augmentation of Piped Water Supply Scheme of Village Nangal Kalan GP Nangal Kalan for providing functional household tap connections under JJM, Tehsil Chomu, District Jaipur
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Augmentation of Piped Water Supply Scheme of Village Morija GP Morija for providing functional household tap connections under JJM, Tehsil Chomu, District Jaipur
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.