Loading…
Loading…
2,214 results • Best match
Construction of Market Shed With Toilet, Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Sonahatu Bazar, Ranchi
Development of tube well in accordance with IS : 2800 (part I) andIS: 11189, to establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessoriesetc., all as per requirement and direction of Engineer-in-charge
Construction of Control Room Building and other Civil works for New 33/11KV substation Manauta Distt. Bijnor.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Construction of Control Room Building and other Civil works for New 33/11KV substation Sirdhani road Distt. Bijnor.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Construction of Control Room Building and other Civil works for New 33/11KV substation Nagla maheshwari Distt. Bijnor.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Construction of Control Room Building and other Civil Works for New 33/11 KV Substation Sitla sarai Distt. Amroha
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR code no 23.12
Bhalki: Rehabilitation of Station building at Bhalki Railway Station.
Selection of suitable site for drilling of bore Numbers well/tube well by suitable method for all diameters - consultancy charges for ground water survey report writing for recommended location including transportation for local survey. The survey will be done by suitable method. 05 nos suitable site will be identified, and best would be recommended for drilling. charges for suitable site selection 5500/5= 1100.00/-