Loading…
Loading…
2,220 results • Best match
Construction of control room, boundary wall, approach road, water supply arrangement and other civil works at 33 KV S/S RIICO Tholai under AEN O and M Andhi.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Construction of Control room, boundary wall, water supply arrangement and yard levelling and gravelling works at 33 KV S/S Ratan Industrial area II under AEN O and M Madhorajpura.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Construction of control room, boundary wall, approach road, water supply arrangement and yard levelling and gravelling work at 33 KV S/S Saali under AEN HTM Dudu.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Construction of Control Room Building and Other Civil Works for 33/11 K.V. S/S Bhandura Distt- Muzaffernagar.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.(DSR. 23.12 (Civil)
Extension of Control Room Building and Other Civil Works for 33/11 K.V. S/S Jain bagh Distt- Saharanpur.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge .(DSR. 23.12 (Civil)