Loading…
Loading…
2,216 results • Best match
Providing irrigation facilities through Borewells to the lands of 1)Lakshmaiahs/oKariyaiahofKyathanahalli(v)2)Shashikalaw/oManjunatha3)Bhadrammaw/oRamaswamy4)Manjunathas/oAnnabhovi5)Nandeeshas/oGiriyabhoviofKB.Palya(v)Halekote(Ho),6)Erammaw/oAnnappa7)Puttaswamys/oJavaraiahofChittanahalli(v)8)Swamys/oGiriyabhovi9)Thimmaiahs/oDasabhoviofChikkabyagathavalli(v)10)Dhanalakshmiw/oBasavarajuofLakkur(v)11)Jayammaw/oDoddaiahofHaralahalli(v)12)Nandeeshas/oDyavaiahof K.byadarahalli(v),HNP(Ho)(TQ)Hassan(D)
Providing irrigation facilities through Borewells to the lands of 1)Lakshmaiahs/oKariyaiahofKyathanahalli(v)2)Shashikalaw/oManjunatha3)Bhadrammaw/oRamaswamy4)Manjunathas/oAnnabhovi5)Nandeeshas/oGiriyabhoviofKB.Palya(v)Halekote(Ho),6)Erammaw/oAnnappa7)Puttaswamys/oJavaraiahofChittanahalli(v)8)Swamys/oGiriyabhovi9)Thimmaiahs/oDasabhoviofChikkabyagathavalli(v)10)Dhanalakshmiw/oBasavarajuofLakkur(v)11)Jayammaw/oDoddaiahofHaralahalli(v)12)Nandeeshas/oDyavaiahof K.byadarahalli(v),HNP(Ho)(TQ)Hassan(D)
Drilling of borwell and providing and fixing of pipe line at swm site
Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by pting Venner or S...
SITC of Fire Fighting System including Aerosol based Fire Suppression System and Lightning Arrester in SDH, Maithili of Malkangiri Dist. during 2025-26
Borewell Construction of 1no. production well including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories .Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr
SITC of Fire Fighting System including Aerosol based Suppression System and Lightning Arrester in SDH, Chitrakonda of Malkangiri Dist. during 2025-26.
Borewell Construction of 1no. production well including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories .Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr
Construction of control room, boundary wall, approach road, water supply arrangement and other civil works at 33 KV S/S Malikpur under AEN O and M Govindgarh.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Construction of control room, boundary wall, approach road, water supply arrangement and other civil works at 33 KV S/S RIICO Toonga under AEN O and M Banskho.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)