Loading…
Loading…
2,172 results • Best match
NEW CONSTRUCTION WORK FOR SETTING UP OF HEALTH WELNESS CENTRE AT KAZIPARA HWC, JALANGI BLOCK, MURSHIDABAD
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.(i) 50 mm dia. boring etc.
NEW CONSTRUCTION WORK FOR SETTING UP OF HEALTH WELNESS CENTRE AT SIBRAMBATI HWC, BURWAN BLOCK, MURSHIDABAD
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.(i) 50 mm dia. boring etc.
Water Supply Scheme for Augmentation and rehabilitation of UWSS Atru District Baran including 05 years O and M after 01 year Defect Liability Period under AMRUT 2.0
Construction of tube well 100 meter & above in all types of rock by DTH System & over burden to accommodate casing pipe of following sizes in all types of soils and overburden including lowering of casing pipes but excluding cost of casing pipe as per IS:2800 (Part – I & II ) 1979 specfications. The work would be completed after obtaining sand free water. The tube-well should have a through out bore as per nomial dia of casing pipe
Construction of Building less Primary Health Centre at Putimari PHC under Samserganj Block in the District of Murshidabad.
Tubewell :- Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.
Construction of Building less Primary Health Centre at Andulberia PHC under Beldanga_II Block in the District of Murshidabad.
Tubewell :- Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.
Construction of Building less Primary Health Centre at Garaimari PHC under Domkal Block in the District of Murshidabad.
Tubewell :- Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.