Loading…
Loading…
2,172 results • Best match
Construction of Building less Primary Health Centre at Kiriteswari PHC under Nabagram Block in the District of Murshidabad.
Tubewell :- Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (a) For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (i) 50 mm dia. boring etc.
Maintenance of trees and shrubs in Central verge on S.K road from LG rotary to Durga Rotary including balance Plantation for two years, Greater Noida.
D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex / Kisan /Supreme approved by engineering in charg eof boring 200 feet.
Construction of Control Room Building and Other Civil Works for 33/11 K.V. S/S Mohiuddinpur Distt- Meerut.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR 23.12
Construction of Control Room Building and Other Civil Works for 33/11 K.V. S/S Achikhurd Distt- Meerut.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR 23.12
Construction of Control Room Building and Other Civil Works for 33/11 K.V. S/S Kazipur-2 Distt- Meerut.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. DSR 23.12
Annual Rate contract for supply and installation of Motor Pump sets in existiing sources in div. Deeg
Providing & Lowering in tube well ISI marked GI Pipe medium duty (“B" class), Steel tube as per IS:1239 or amended up to date and zinc coating as per IS 4736, threaded and double flanged (welded) on both ends and two number 25x3mm MS flat welded on both ends between pipe & flange, rubber washer & nut bolts etc. complete in all respect.