Loading…
Loading…
2,169 results • Best match
Work No 04 Gram Anguri mein Swasthya Upkendra ka Nirman Karya
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge..
Construction of control room building, boundary wall, approach road, yard levelling, gravelling and water supply arrangement at 33 KV S/S Nangli Megha (Ramgarh)
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Construction of control room building, boundary wall, approach road, yard levelling, gravelling and water supply arrangement at 33 KV S/S Khoh (Kathumar)
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Construction of control room building, boundary wall, approach road, yard levelling, gravelling and water supply arrangement at 33 KV S/S Ambedkar Nagar (Alwar)
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Repair and Maintainance of Govt. Tribal Girls Ashram Hostel at Kherwara I Dist Udaipur
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe:150mm-do-
DEVELOPEMNT OF HUB FOR WELFARE OF HANDICRAFSMEN AKOLA
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore