Loading…
Loading…
2,176 results • Best match
Construction of Type-A Building less Sub-Health Centre (SHCs)-HWCs (AAM) under PM-ABHIM for FY 2025-26 at Domohani SC under Binpur-I Block, Jhargram District.
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.
BLOCK REPAIR AND PAINTING OF VESSEL M.V. NATARAJ
Sea water tubewell to be renewed including suction valve and pipe line.
Retrofitting of Kuriya Gaon Water Supply Scheme including supply of all material, labour, T and P etc. complete.
Supply and fixing of 400 Amp TPN main switch 3 phase, 415 volt, 50 H havells make heavy duty double break main switch with HRC fuse making connection at this testing complete work etc at inter college tubewell.
CONSTRUCTION WORK OF NEW SUBDIVISION EXTENSION WORK OF SGR BUILDING, CONSTRUCTION AND REPAIR WORK OF BOUNDARY WALL AND SPECIAL REPAIR AND OTHER RELATED CIVIL WORKS AT 33/11 KV S/S FATEHPUR SIKRI (IPDS)
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. (DSR ) (DSR 23.12)
RECONSTRUCTION OF THE DAMAGED ROOF OF THE DIVISIONAL OFFICE, AND CONSTRUCTION OF LADIES TOILET , PLASTER REPAIR, SANITARY WORK, RENOVATION OF WINDOWS AND DOORS AND OTHER MISCELLANEOUS CIVIL WORKS IN THE VISILENCE OFFICE KAMLA NAGAR AGRA
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. (DSR ) (DSR 23.12)
Sinking of Additional Source to resolve tail end pressure along with allied works like Interconnection and Laying distribution pipeline, Construction of Pump House, Construction of KHARBA Piped Water Supply Scheme at Chanchal-I Block of Malda Distric
Lowering the tube well assembly (UPVC Casing pipe ,well pipe, strainer along with UPVC accessories) vertically in a position with proper lowering arrangement by applying necessary jointing compound including labour cost for subsequent gravel packing and machine operation cost etc.