Loading…
Loading…
2,176 results • Best match
Work of construction of Sources, rising main pipelines, RCC Reservoir, internal village distribution pipeline and FHTC including one year Defect Liability period of Village SHAHJAHANPUR under Subdivision Neemrana under JJM in the jurisdiction of PHED
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 200 mm dia. (PHED 2021/2.3.2)
Construction Of Tribal Multipurpose Marketing centre at Laxmipur,Dist:-Jamui (With Electrict work)
Development of tube well in accordance with IS : 2800 (part I ) and IS : 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by 'V' notch method or any approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory,i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Construction work of 30 Judge's residence(G+05) in the old jail premises of civil court, Jamui
Development of tube well in accordance with IS : 2800 (part I ) and IS : 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by 'V' notch method or any approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory,i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Const. of C/R building, B/wall, Water supply arrangement and Other Misc. Civil works at 33 KV S/S Lalsot.
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Const. of C/R building, B/wall, Water supply arrangement and Other Misc. Civil works at 33 KV S/S Munapura (Mahwa).
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)
Const. of C/R building, B/wall, Water supply arrangement and Other Misc. Civil works at 33 KV S/S Lakhanpur (Lalsot).
Construction of tube well after completion of drilling by rotary /percussion method & upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. Nominal bore 150 mm dia. (P 2.3.1)