Loading…
Loading…
2,176 results • Best match
Development work for underground parking and Azad Park (13,000 sq. m.) at Azad Park, Bundi Municipal Council.
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore
Under District Kushinagar, Construction of Residential/Non-Residential Buildings of District Rural Development Institute in Kushinagar District, Lot No 1
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge., Sch No 23.12
Construction of Govt. ITI Building (4 Trade) at Bardod, Distt. Kotputli-Behror
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200mm dia.
Construction of new building for building less Anganbari Centre Harli 2 in the Premises of Government Middle School Harli Hazaribag Rural
Supplying all tools, labours, equipments for lowering 32mm dia G.I. suspension pipe in 3 mtr. length in the drilling bore of tube well etc. all complete job as per direction of E/I.
Construction of Fire Fighting, Rain Water Harvesting, DG Plate Form, UMP Room & Lift PIT Water Proofing for UTD Building 1,2,3 & 4 at CSVTU NEWAI Bhilai Distt.- Durg
Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge.
CONSTRUCTION OF MODEL POLICE STATION BUILDING AT GANGAUR POLICE STATION IN THE DISTRICT OF KHAGARIA WITH ELECTRIFICATION
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.