Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.5 CrAdmitted-Finance | -4.11% | ₹24.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹24.8 Cr+₹30.2 L (1.23%)Admitted-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | -4.59% | ₹24.8 Cr+₹30.2 L (1.23%) | L2 | Admitted-Finance |
| 3 | L3₹25.1 Cr+₹68.3 L (2.79%)Admitted-Finance | -2.11% | ₹25.1 Cr+₹68.3 L (2.79%) | L3 | Admitted-Finance |
| 4 | L4₹25.3 Cr+₹80.9 L (3.31%)Admitted-Finance N 29 ADINATH NAGAR OPP WORLD TRADE PARK JAI JAWAN COLONY III MALVIYA NAGAR JAIPUR 302034 RAJ | JAIPUR | JAIPUR | RAJASTHAN | 302034 | -2.79% | ₹25.3 Cr+₹80.9 L (3.31%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technical Disqualified |
| Sl No | Description | Qty | Unit | M/S GULSHAN RAI JAIN-II L4 | JCC INFRAPROJECTS PVT. LTD. L1 | LNA Infraprojects Private Limited L3 | P S INFRACORP PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|
| 1.00NON BSR ITEMS | |||||||
| 2.00WATERPROOFING | |||||||
| 3.00 | Supplying and laying minimum 1.2mm thick, pre-applied, fully bonded pure HDPE membrane Fosroc HDPE P STD 1.2mm, over P.C.C. The system should be fully bonded to the RCC and consists of highly resilient HDPE film, self-adhesive polymer layer & unique novel particulate layer. The membrane shall be loosely laid onto the PCC surface and shall be capable of receiving the structural steel & concrete directly over the membrane. The membrane shall have minimum of 75mm side and end laps which shall be sealed. Makes:- Fosroc, BASF, Bostic | 5,913.75 | Sqm | 1,100 ₹65,05,125 | 480 ₹28,38,600 Lowest | 1,050 ₹62,09,437.5 | 1,350 ₹79,83,562.5 |
| 4.00 | Providing and laying Fosroc Proofex 3000V 1.5 mm thick SBS based self-adhesive waterproofing membrane topped with HDPE cross laminated film with the following, reapir the porous areas with PMM (polymer modified mortar), proper coving(50 mmx 50mm)at sharp edges of concrete and priming the surface with cold applied bituminous primer. The SBS membrane should be sealed properly at joints and maintaining 75 mm overlap between the membrane selvedge & 100 mm overlap on the end joints of the membrane over the slab etc. A metal termination strip by screw the metal strip to fix at end of the retaining wall waterproof. Makes:- Fosroc, BASF, Bostic | 669.6 | Sqm | 1,200 ₹8,03,520 | 650 ₹4,35,240 Lowest | 1,125 ₹7,53,300 | 800 ₹5,35,680 |
| 5.00 | Providing and fixing Dimple board protection having dimple height of 6 to 8 mm, as a protection board, over the waterproofing membrane for vertical surface stuck to the membrane by spot bonding method, using synthetic adhesive etc, | 666 | Sqm | 300 ₹1,99,800 | 280 ₹1,86,480 | 250 ₹1,66,500 Lowest | 400 ₹2,66,400 |
| 6.00Injection Grouting (wherever required): Providing and applying injection grouting treatment by chemical injection grout process at construction of cracks and honeycomb areas at the concrete surface. the area using nozzles of min 30-60mm deep in concrete, slabs consisting of injection cement slurries of different viscosities under pressure by pump using injection grout waterproofing chemical (Fosroc Cebex 100) mixed with neat cement slurry and sealing off nozzles after the injection operation. Surface Preparation: Cleaning and preparation of surface with the help of wire brush. Clean the surface with clean water. Remove all loose mortar, grease, oil using wire brush, hair brush and air blower. Repair and fill all cracks, honeycomb areas are sealed by preparing polymer modified mortar mixed with Fosroc SBR Latex in the ratio of 1:3 by adding polymer 10% by weight of the cement, add the water little, until the required consistency is achieved. Gola: Providing 50 mm X 50 mm angle fillets on the vertical up- stands, parapet wall junction corners, service units and properly dressed by preparing polymer modified mortar with Fosroc SBR LATEX in the ratio of 1:3 by adding polymer 10% by weight of the cement, add the water little, until the required consistency is achieved. Waterproofing PU Layer: Primer- Supply and apply single coat of Fosroc Nitoproof WB primer as deep impregnating primer coat. Main Course: Supplying and applying coat of Fosroc Nitoproof 600PF (hydrocarbon free, single component liquid polyurethane), liquid applied waterproofing membrane shall be laid using brush/roller/wiper in 2 layers to attain a seamless state of membrane. The layers of the liquid membrane to be terminated properly. The laying of Liquid applied membrane. All the coats to be applied in right angle to each other with an interval of 8-10 Hrs. The coating shall have Elongation at break > 500-700% as per ASTM D412-90, Tensile strength > 1.9 N/mm2 as per ASTM D412-90, Adhesion -in-peel test (N): 60 N as per ASTM C836, Tensile Adhesion : > 1.5 Mpa Makes:- Fosroc, BASF, Bostic | |||||||
| 7.00 | Separation Layer: Providing and laying a layer of Geotextile 140-180 gsm over
waterproofing after the hydro test of waterproofing. | 5,472 | Sqm | 1,550 ₹84,81,600 | 2,000 ₹1,09,44,000 | 1,500 ₹82,08,000 | 725 ₹39,67,200 Lowest |
| 8.00 | Groove opening: Cut and open the gooves in V-shape. Repair and fill the gap by preparing polymer modified mortar mixed with Fosroc SBR Latex polymer 10% by weight of the cement, add the water little, until the required consistency is achieved. After fiiling laying 100mm wide Fiber-mesh 45 gsm over the grooves by sandwitching with two coats of brushbond RFX. Makes:- Fosroc, BASF, Bostic | 360 | Rmt | 200 ₹72,000 | 200 ₹72,000 | 175 ₹63,000 Lowest | 250 ₹90,000 |
| 9.00WATER FOUNTAIN | |||||||
| 10.00 | SITC of Stainless Steel 304 grade High Volcano Straight Jet Nozzle inlet in 100mm dia. for connection and size of nozzle is 300mm in length & 150mm dia. with 2 nos. air release points suitable for water effect to achieve height upto 35-40 Ft. High complete as required. Makes:- Colour Design India | 1 | Each | 89,000 ₹89,000 | 65,000 ₹65,000 Lowest | 85,000 ₹85,000 | 2,00,000 ₹2,00,000 |
Tender Value
₹25.8 Cr
EMD Value
₹51.7 L
Closing Date
13 Jul 2026, 6:00 pmClosed
Commissioner,Nagar Parishad Bundi
Nagar Parishad Bundi, Rajasthan 323001
Development work for underground parking and Azad Park (13,000 sq. m.) at Azad Park, Bundi Municipal Council.
2026_DLB_567746_1
NPB/Nirman/2026-27/3144 Dated 05/06/2026
Open Tender
Civil Works
Percentage
Nagar Parishad Bundi
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
Commissioner, Nagar Parishad
₹51.7 L
Yes
22 Jul 2026
15 Jun 2026
16 Jul 2026
15 Jun 2026
13 Jul 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | - | - |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit to required compaction as per MoRT&H specification clause 201. (Measurement of girth to be done at height of 1 m above ground level) | - | - | - | - |
| 3 | Girth from 600 mm to 900 mm | 15 | Each | 752 | ₹11,280 |
| 4 | Girth from 900 mm to 1800 mm | 8 | Each | 1,572 | ₹12,576 |
| 5 | Girth from 1800 mm to 2700 mm | 10 | Each | 3,075 | ₹30,750 |
| 6 | Girth above 2700 mm | 12 | Each | 6,010 | ₹72,120 |
| 7 | Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201. | 1.34 | Hectare | 35,900 | ₹48,106 |
| 8 | Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately as per MoRT&H specification clause 202. | 50 | Each | 323 | ₹16,150 |
| 9 | Dismantling of the four pole structure with mounted transformers along with distribution boards G.O, D.O, street light panel, stays, earthing wire pipe, cabling etc & installing the same transformer on the structure newly erected along with distribution board along with erection, testing and commissioning. | 4 | Each | 25,405 | ₹1,01,620 |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DocumentAzad.pdf
Tender Documents • 25.08 MB
BOQ_1009922.xls
BOQ • 0.96 MB
date_corrigendum.pdf
PDF • 0.11 MB
corrigendum3144.pdf
PDF • 0.15 MB
corrigendum3144.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .