Loading…
Loading…
2,176 results • Best match
CONSTRUCTION OF FIRE STATION AT INDUSTRIAL AREA MUSSOORIE GULAWATHI ROAD DISTRICT HAPUR
Development of tube well in accordance with IS : 2800 (part I) and IS: 10889, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
CONSTRUCTION OF TOILETS AND URINALS IN MUNICIPAL AREA, NATHDWARA.
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore
Construction of Rajkiya High School Markuwa, Block gursray, Jhansi U.P. Under Scheme Samagra Shiksha 2025-26
Development of tube well in accordance with IS: 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, ic disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Construction of Rajkiya High School Simardha, Block gursray, Jhansi U.P. Under Scheme Samagra Shiksha 2025-26
Development of tube well in accordance with IS: 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, ic disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
Rain Water Harvesting Theme Park Development at Gulshan Garden in Kalaburagi City (Category-Others) (Est Cost Rs. 95.00 Lakhs) (15th FC 2024-25 C.O.W)
Providing and fixing of Borewell Recharge Model Borewell Recharge. This model is to show rainwater collection and storage system on a flat roof with a working rain simulation to show the process.: Mod...
Providing Rising main and OHT to Bennur B Tanda in Chittapur Taluka under KKRDB
Bennur B Tanda Sinking of Borewell of 165mm dia clear using super fast hydraulic Rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burden Fixing of casing pipes, collars &...