Loading…
Loading…
2,176 results • Best match
CONSTRUCTION OF POLICE STATION BUILDING (G+3 STRUCTURE) AT BASMATIYA POLICE STATION WITH ELECTRIFICATION IN THE DISTRICT OF ARARIA
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete,including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
DISHWASHING AREA, STAFF TOILET, UNDERGROUND WATER TANK,
[20.103.1]Development of tube well according to clause 9.3 of IS: 2800-1991 (Part-I) as amended up to date and specifications attached and as directed by the Engineer-in-charge of the work including the cost of all consumable stores, fuel, oil, compressors, pumps and machinery etc. as required for the work. 1. Compressor 450cfm x 250 psi [Through Rate]
Estimate for Renovation of KandhuKhera Rest House at RD 56000 of LambiDisty.
Boring with casing pipe for tubewell in all soils except ordinary hard rocks requiring blasting including removing the casing pipe after the tube well is lowered & tested , equipment as requried such as hand boring machine and its accessory, transportation to site and vice versa etc. complete in all respect. Boring with 150mm id Housing Pipe Upto 150 m depth BGL.
Estimate for Reconstruction of SehnaKhera Rest House at RD 11000 of LambiDisty
Boring with casing pipe for tubewell in all soils except ordinary hard rocks requiring blasting including removing the casing pipe after the tube well is lowered & tested , equipment as requried such as hand boring machine and its accessory, transportation to site and vice versa etc. complete in all respect. Boring with 150mm id Housing Pipe Upto 150 m depth BGL.
REPAIR / MAINT OF EXTERNAL WATER SUPPLY AND CONNECTED ITEMS AT AF STATION DWARKA AND KHAMBHALIYA UNDER GE (AF) JAMNAGAR NO.2
Taking out the borewell pump with borewell lifting machine and disconnecting the all electrical connection and install after fixingMS pipe heavy column pipe to borewell motor with accessories to fix the borewell pump and done all the electrical connection as existing, complete all as specified and directed.
Water Supply Scheme for Augmentation of UWSS Baseri, Distt. Dholpur including 05 years OnM after 01 year Defect Liability period under Amrut 2.0
Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.