Loading…
Loading…
2,176 results • Best match
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as Intake Well at Dharoi Dam Site, Elevated Service Reservoirs (E.S.R), HGLR, Sump, Water Treatment Plant, Chemical House, Staff Quarters, Pump House, All Bulk Transmission and Distribution Pipelines, Valves, Pumping Machinery & Electrical Equipment etc. , Including supply of 9.70 MLD potable water to all the 45 villages / 14 habitations for Dharoi Dam Based Sudrasana RWSS& Water supply of 3.75 MLD potable water to all the 20 villages / 16 habitations for Vanaj Devinagar Section of Dharoi Dam Based Idar-vadali RWSS, &Dharoi Intakewell for Supply of 43.16 MLD Raw water for Various RWSS for 17 months Taluka: Idar, Vadali, District: Sabarkantha.
2.0 complete. (IS -1239) (Not for well/tube well column pipe and
Construction of New Livelihood College Building at Sarangarh. i/c W.S.S.F. Electrification & Approach Road Works.
Providing and fixing filter of minimum 100 litre capacity for roof top rain water harvesting through tube well consisting of two layered HDPE tank with five layers (each layers of minimum 100 mm) consist of coarse sand, 4mm, 6mm, 8mm & 12 mm gravels with stainless steel wire mesh fixed between each layer with suitable length and sufficient numbers of 110 mm dia PVC pipe pieces in the bottom of tank to support the above layer including fixing of inlet and out let P.V.C. pipe of required diametre upto 2 metre length on each side, Cement Concrete plateform of required size complete as directed by Engineer in charge. (excluding cost of tubewell and inlet and outlet pipe beyond 2 metre)
Construction of Dormentary Building at Bus-Stand Back Side Survey No 393 4 in Rameswaram Municipality
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs fuel, labour and drilling bentonite and water required for drilling at site including construction of mud pit.
Construction of Type-B (16 Nos) of Residence at Mehnagar Thana in District-Azmgarh (U.P.)
Development of tube well in accordance with IS : 280D (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limît), with required capacity air compressor, running the compressor for required time. tifl well ïs fully developed, measuring yield of well by 'V* notch method or any other approved method, measuńng static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire & labour charges of aİr compressor, tools & accessories etc., .all as per requirement and direction of Engineer-in-charge.
Construction of 50 Bedded New CHC Building at Kapren District Bundi (Including Internal Electrical Work) (State Head)
Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe:
12556-Construction Paddy Procurement Center Building at Almonda under Bandhugaon in the District of Koraput during the year 2025-26
Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 30mtr