Loading…
Loading…
2,178 results • Best match
E-Tender for Construction of RO Plant each to the capacity of 2000 litres in three locations at St.Thomas Mount and Pallavaram
Conducting physical survey for identification of suitable location for borewell including the loading, unloading and transporting charges for machineries etc., complete as per standard spedifications.
Development of Rajiv Gandhi Theme park at Dariyapur in Kalaburagi City.
BOREWELL AND PIPE LINE. Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S by vertical electrical soundi...
Operation and Maintenance of CPWS Scheme to Chintalapudi in Chintalapudi Mandal for the Year 2026-27 Est Cost Rs.24.50 Lakhs.
... 5 to 25 MLD, 25 to 50 MLD , 50 to 100 MLD and Sources having large dia High yielding tube wells (Annexure is enclosed for the System staff.) (Population x LPCD X 243/1000) from 01.10.2025 ...
Construction of 100 Bedded Hostel at Residential Boys High School, Sakhuapani, Bishunpur, Gumla
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...
Building Work
10000896 Cleaning and developing the production well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge.)(MUD ROTARY RIG DRILLING). Ground Floor
CONSTRUCTION OF BLOCK-CUM-CIRCLE OFFICE-CUM-RESIDENTIAL BUILDING AT PIPRAKOTHI BLOCK IN THE DIST EAST CHAMPARAN FOR THE YEAR-2026-27.
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully develo ped, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...