Loading…
Loading…
2,178 results • Best match
Annual Rate Contract for various Electrical work including repair and maintenance etc. In Rajasthan Secretariat Jaipur.
Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect.
NABARD-RIDF-XXX-Development, upgradation and Associated Infrastructure works of Fishing Harbour in Thrissur District-Chettuva Fishing Harbour- Construction of Wharf and Auction Hall
... for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . 700 mm dia pile
Repair and waterproofing of the roof of the administrative building at the District Institute of Education and Training DIET Lalitpur.
Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge.
Construction Work of Non-Residential Buildings in the Sadar Tehsil of District Shahjahanpur
Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable... with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down ...
Design and Construction of Underground Section from Charbagh Metro Station to Chowk Metro Station Approx 6.70 km, Construction of 07 Underground Metro Stations including Civil Works for Phase 1B of Lucknow Metro Rail Project at Lucknow UP
Testing and overpumping (25% of tube well for 16 hr to record draw down recovering yield test as per IS 2800 Part II ) including flushing of both borewells.
PROVIDING INFRASTRUCTURES TO PROPOSED CONSTRUCTION OF ADMINISTRATIVE BUILDING AT MAIN MARKET YARD TIPTUR UNDER AAP 2024-25
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and ...