| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC | ₹3.4 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹3.5 Cr+₹11.6 L (3.39%)Rejected-Finance | ₹3.5 Cr+₹11.6 L (3.39%) | L2 | Rejected-Finance Second |
| 3 | L3₹3.7 Cr+₹24.3 L (7.09%)Rejected-Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹3.7 Cr+₹24.3 L (7.09%) | L3 | Rejected-Finance Third |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 5 | Rejected-Technical | - | - | Rejected-Technical Fifth position |
| Sl No | Description | Qty | Unit | Mountcarve Projects LLP L1 | RTF INFRA PRIVATE LIMITED L6 | SHAJI.K.K L7 | M S BUILDERS INDIA PVT LTD L5 | S.K.J.K INFRASTRUCTURE DEVELOPERS PVT LTD L2 | AA AND S CONSTRUCTIONS L3 | NASEER PM L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix 1 - Wharf Pile Boring | ||||||||||
| 1.00 | OD7886/2025-2026:Supplying, fitting and placing in position reinforcement using High Corrossion Resistant (HCR) for the RCC works for cages , supetrstructure including cost of materials, labour charges, conveyance , cutting, bending and tying in position, providing precast cover blocks etc, complete as per drawing and technical specifications and as directed by Engineer in charge, excluding cost of welding charges. Unit=1MT taking output=1MT (TS No 39/18-19) | 32.64 | MT | 1,03,524 ₹33,78,816.31 | 1,12,000 ₹36,55,456 | 1,20,196.91 ₹39,22,986.75 | 1,15,020.97 ₹37,54,054.42 | 1,03,634 ₹33,82,406.49 | 1,02,000 ₹33,29,076 Lowest | 1,04,000 ₹33,94,352 |
| 1.00 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 20.46 | MT | 1,01,400 ₹20,75,151 Lowest | 1,35,000 ₹27,62,775 | 1,47,973.77 ₹30,28,283.2 | 1,41,601.69 ₹28,97,878.59 | 1,27,583 ₹26,10,986.1 | 1,26,000 ₹25,78,590 | 1,27,000 ₹25,99,055 |
| 1.00 | OD1098/2026-2027:Bored cast insitu M40 grade plie using batching plant, transit mixer and concrete pump excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. pile diameter - 700mm, including protective bunds, platform, driving down etc. | 868 | metre | 6,615 ₹57,41,820 Lowest | 8,200 ₹71,17,600 | 7,679.5 ₹66,65,806 | 8,300 ₹72,04,400 | 6,687 ₹58,04,316 | 7,320 ₹63,53,760 | 6,700 ₹58,15,600 |
| 1.00 | OD1350/2026-2027:Supplying and fixing cast iron bollards including cost of fittings and labour charges etc
complete | 1,080 | kg | 132 ₹1,42,560 | 130 ₹1,40,400 | 134.7 ₹1,45,476 | 128.9 ₹1,39,212 | 160 ₹1,72,800 | 117 ₹1,26,360 Lowest | 210 ₹2,26,800 |
| 1.00 | OD1512/2026-2027:Supplying and fixing 600mm long 20mm dia foundation bolt with each nuts and washers fixing bollards including all cost, fixing charges etc. (Sanctioned data of FHP Ponnani - Construction of quay, auction hall and reclamation work.) | 90 | each | 366 ₹32,940 | 400 ₹36,000 | 407.41 ₹36,666.9 | 389.87 ₹35,088.3 | 395 ₹35,550 | 352 ₹31,680 Lowest | 700 ₹63,000 |
| 2.00Appendix 1 : Construction of Wharf and Auction hall | ||||||||||
| 2.00 | 16.45:Providing and fixing in position pre- moulded joint filler in expansion joints. | 66 | per cm depth per cm width per meter length | 6 ₹396 | 6 ₹396 | 6.14 ₹405.24 | 5.88 ₹388.08 | 60 ₹3,960 | 5.5 ₹363 Lowest | 300 ₹19,800 |
| 2.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1,121.64 | sqm | 870 ₹9,75,825.93 | 980 ₹10,99,206.22 | 1,004.5 ₹11,26,686.38 | 961.24 ₹10,78,164.27 | 866 ₹9,71,339.37 | 865 ₹9,70,217.74 Lowest | 900 ₹10,09,475.1 |
| 2.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 16.25 | metre | 207 ₹3,363.54 | 230 ₹3,737.27 | 238.4 ₹3,873.76 | 228.13 ₹3,706.88 | 218 ₹3,542.28 | 206 ₹3,347.29 Lowest | 400 ₹6,499.6 |
Tender Value
₹3.8 Cr
EMD Value
₹1 L
Closing Date
29 Jun 2026, 6:00 pmClosed
Superintending Engineer HECC
Superintending Engineer, Harbour Engineering Central Circle, Corporation Building, Paramara Road, Ernakulam North,Kochi-18
NABARD-RIDF-XXX-Development, upgradation and Associated Infrastructure works of Fishing Harbour in Thrissur District-Chettuva Fishing Harbour- Construction of Wharf and Auction Hall
2026_HED_855965_1
HED/CEHED/TR/1094/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
240 days
Chettuva Fishing Harbour
Please refer Tender documents.
11 documents required · 11 mandatory
₹8,270
Yes
₹1 L
Yes
20 Jul 2026
15 Jun 2026
1 Jul 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 - Wharf Pile Boring | |||||
| 1.001 | OD7886/2025-2026:Supplying, fitting and placing in position reinforcement using High Corrossion Resistant (HCR) for the RCC works for cages , supetrstructure including cost of materials, labour charges, conveyance , cutting, bending and tying in position, providing precast cover blocks etc, complete as per drawing and technical specifications and as directed by Engineer in charge, excluding cost of welding charges. Unit=1MT taking output=1MT (TS No 39/18-19) | 1 | MT | - | - |
| 1.002 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 1 | MT | - | - |
| 1.003 | OD1098/2026-2027:Bored cast insitu M40 grade plie using batching plant, transit mixer and concrete pump excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. pile diameter - 700mm, including protective bunds, platform, driving down etc. | - | metre | - | - |
| 1.004 | OD1350/2026-2027:Supplying and fixing cast iron bollards including cost of fittings and labour charges etc
complete | - | kg | - | - |
| 1.005 | OD1512/2026-2027:Supplying and fixing 600mm long 20mm dia foundation bolt with each nuts and washers fixing bollards including all cost, fixing charges etc. (Sanctioned data of FHP Ponnani - Construction of quay, auction hall and reclamation work.) | - | each | - | - |
| 2Appendix 1 : Construction of Wharf and Auction hall | |||||
| 2.001 | 16.45:Providing and fixing in position pre- moulded joint filler in expansion joints. | - | per cm depth per cm width per meter length | - | - |
| 2.002 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.6 | sqm | - | - |
| 2.003 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1446727.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
epay.pdf
Additional Documents • 0.23 MB
NITSBD.pdf
Tender Documents • 2.21 MB
Preliminary_Agmt.pdf
Tender Documents • 1.28 MB
affidavit.pdf
Tender Documents • 0.60 MB
BOQ_1446727.xls
BOQ • 0.33 MB
FOT.pdf
Tender Documents • 0.68 MB
Integrity.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .