Loading…
Loading…
2,126 results • Best match
Drilling of 05 New Borewells in Doddathoguru limits and 05 New Borewells in Bettdasanpura Village limits in Doddathoguru Town Panchayath limits
Drilling of 05 New Borewells in Doddathoguru limits and 05 New Borewells in Bettdasanpura Village limits in Doddathoguru Town Panchayath limits
Drilling of tubewell by FDR machine at Sudama nagar in Ward no. 18
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. UADD SOR 20.1/254
Drilling of tubewell by FDR machine at various place in ward no. 19
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. sor no. 20.1/254
Drilling of tubewell by FDR machine at various places in ward no. 40
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. UADD SOR 20.1/254
8225/E8
M&L for carryout hydrological investigation for water supply/feasibility report of three location by the contractor near Hansa vihar , including provision of all material ,labour,tools,and equipment . Work to be executed through the state ground water board or a government- approved agency. The scope includes: (a) Conducting scientific surveys and borehole analysis to assess maximum underground water yield. (b) Submision of a detailed hydrological report indicating aquifer data, water table depth ,yield test results, and site recommendations.(c) Marking of map and at site the best location for borewell installation, based on investigation results. All work to be completed before commencement of bore well drilling and strickly as directed by the engr-in-charge.
Installation of a pipeline from the Borewell behind the Bashettihalli T P scout camp to Obadenahalli village
Installation of a pipeline from the Borewell behind the Bashettihalli T P scout camp to Obadenahalli village