Loading…
Loading…
2,126 results • Best match
HDPE pipeline work from 48F waterworks to Harshpindersingh tubewell
COMMISSIONING WORK OF TUBEWELL NEAR WATER TANK VILLAGE BANA
Supply and installing 3 phase submersible motor pump set ISI marka of approved Brand and equivalent, making connection suitable of TW/DCB/Open well. This job includes screwin and welding of flanges of GI rser pipes, installation
Prov. and fixing of DI water supply pipeline along with Drilling, Installation and commissioning of 1 No. MS tubewell by hydraulic rotatory drilling (reverse circulation) and 1 No. PVC tubewell in Bharti enclave and Arya Enclave Ward No.14 MC Panipat
Construction of bore pit for tube well including excavation, pcc/cc, brickwork, plaster, rcc slab and all other contingent works thereto complete in all respect.
Providing Borewell and 7.5 HP Motor,Pipe Line Arrengements at Gollakuppam Irular Colony In Ponpadi Panchayat
Drilling of 12" dia vertical borewell so as to have a finished size of 6" dia borewell in boulder area to any required depth as decided by the TWAD Board officers including Transportation from one place to another place with in Tamilnadu State by direct of reverse rotary mud circulation method using Contractor's rig tools, fuel, labours, bentonite mud and water required for drilling at the site shown by the TWAD officers including construction of mud pit etc using only calx rigs.
Annual Plan-Electrical Work - Kunju Nair Vadakkumpuram Drinking Water Scheme Chalavara GP-Renewal of Borewell Pump
OD468816/2025-2026:Supply and installation of 50mm SS adaptor set for both bottom and top, including providing, borewell caps and clamps suitable for 7.5 hp borewell motor pump set
REPAIR MAINTENANCE TO COLUMN PIPE OF BOREWELL FITTINGS AND ALLIED WORK AT AF STN BAMRAULI UNDER GE AF BAMRAULI
Development of tube well by means of pumping high velocity 250 to 400 psi air compressor all as specified including arrangement for equipment fitting and supply of sodium heptasulphate 20 kg all as specified for the bore wells located at various pump houses, complete all as specified and directed by Engr-in-Charge. Note : The above rates are also inclusive for arrangement of suitable dia and length of PVC/canvas pipes to drain the pumped water into the nearest drainage and to ensure water shall not be stagnated near the installation.