Loading…
Loading…
2,125 results • Best match
Drilling of tubewell by Inwell and FDR Machine in varrious place at ward no. 31
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. 20.1/254
PROVISION OF TWO BOREWELL IN E-TYPE QUARTER AREA INCLUDING DISTRIBUTION PIPELINE AT RCI TOWNSHIP UNDER GE I RCI HYDERABAD
Development of borewell as per IS- 2800 by means of compressor of min 250 PSI capacity air compressor untill the sand free water is obtained from the well for an uninterrupted period of 16 hours in a cycle of 24 hours. The final discharge shall be free from sand to deliver minimium 3 LPS of water and carrying out necessary yield test by V notch method and submitting the test reportfor (The rate quoted by the contractor deemed to inlcuded report for chemical /bacteriological analysis and potability test of water obtained from borewell from approved lab and submitting the report in triplicate, complete all as specified and directed by Engineer-In-charge)
PROVN OF BOREWELL PLUS SOLAR ENERGY AND ITS ALLIED WORK FOR GE 873 EWS AT PRATAP PUR UNDER GE 873 EWS
Electrologing test with using suitable equipments for upto complete drilling depth of tube well before sinking/lowering of pipes, filters etc for arresting proper deliniation of water from Govt recongnised agency/Govt firm qualified Hydrologist and report shall be submitted to GE/ Engineer-in-Charge for approval complete all as specified and directed.
Drilling of tubewell by Inwell and F.D.R. Machine in varrious place at ward no. 23
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. sor no. 20.1/254
Drilling of tubewell by Inwell and F.D.R. Machine in varrious place at ward no. 42
Carrying out the resistivity survey by VES method using Schlumberger configuration for locating the proper spot for drilling of tube well with in the selected habitation, including Photography, interpretation of resistivity data and submission of report in the desired format along with resistivity necessary graph, photographs and readings. sor no. 20.1/254
Work of Boiler tube surface preparation, thickness survey measurement with Party’s D-meter, Radiography testing / PAUT of old/new weld joints & MPI testing of Boiler Drum in Unit – 3 at KLTPS.