Loading…
Loading…
2,007 results • Best match
Electrical work in connection with Provision of Automatic Block signaling with Centralized Traffic Control (CTC) system Lucknow- Gorakhpur cant section, Upgradation of maintenance facilities of old coaching depot at GKP, Provision of P.P. shelter at ... deep tube well ... tube well with ...
All work pertaining to Horizontal Directional Drilling (HDD)/Boring and trench less cabling. It includes supply, transportation and insertion of self-lubricated HDPE pipe and laying of 39 cable in boring under the track/road by using different sizes of pipes depending on total number of cables will be crossed. The depth of horizontal boring should be 3 mtrs from rail flange/road level. This item will be used for track crossing of running lines.) By using self-lubricated HDPE pipe of 120/125 mm outer dia (PN-6) as per IS:4984 or latest in the bore and the laying of cables in the track/road. (HDPE Pipe shall be supplied by Contractor)
Providing Deep Borewell with Mini Power Pump and PVC Pipe line at Nalani street to Thiruvalluvar street in Ward No.59 in Zone-4 at Tambaram City municipal corporation
Supply and delivery of 200mm dia PVC Plain casing Pipe with ISI make including cost and conveyance of all materials and all other labour charges etc. complete as per SS. Note:- Approximate length of pipe is given the length may be decided as per site conditions during drilling of borewell.(With slots and with out slots)
Drilling of 150mm dia Tubewell with installation of India Mark Hand pump set Including Construction of Plateform Complete at Different Locations in Ward No. 66. File No. 61/26X9/1
Disinfection of tube well using bleaching powder solution as per the direction of the Engineer in Charge including the cost of bleaching powder and labour etc. complete. (6 Each tube well)
Installation of Tubewell by water jet system at Bicharak Abasn, Banashree Para, Krishnagar, Nadia under Nadia Construction Division (P.W.D.) during the year 2025-2026.
Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia.. (i) 50 mm dia. boring etc.
Sinking of Tubewell with platform Soak Pit and Silt chamber near the house of Sadhu Das at Refujee Colony Sansad III under Swami Vivekananda GP
Sinking of Tube-well with platform,Soak Pit & Silt chamber near the house of Sadhu Das at Refujee Colony,Sansad-III under Swami Vivekananda G.P
Providing 2 nos of tubewell in village Rampura ward 18, under MC Manesar limit.
Providing 2 nos of tubewell in village Rampura ward 18, under MC Manesar limit.